Get Our Extension

Canal Street station (New York City Subway)

From Wikipedia, in a visual modern way
 Canal Street
 "6" train"6" express train"J" train"N" train"Q" train"R" train"W" train"Z" train
MTA NYC logo.svg New York City Subway station complex
Canal St entrance JZ.jpg
Entrance to the J/Z train station
Station statistics
AddressCanal Street between Broadway & Centre Street
New York, NY 10013[1]
BoroughManhattan
LocaleChinatown, Little Italy, SoHo
Coordinates40°43′5″N 74°0′0″W / 40.71806°N 74.00000°W / 40.71806; -74.00000Coordinates: 40°43′5″N 74°0′0″W / 40.71806°N 74.00000°W / 40.71806; -74.00000
DivisionA (IRT), B (BMT)[2]
LineBMT Broadway Line
IRT Lexington Avenue Line
BMT Nassau Street Line
Services   4 late nights (late nights)
   6 all times (all times) weekdays until 8:45 p.m., peak direction (weekdays until 8:45 p.m., peak direction)​
   J all times (all times)
   N all times (all times)
   Q all times (all times)
   R all except late nights (all except late nights)
   W weekdays only (weekdays only)
   Z rush hours, peak direction (rush hours, peak direction)
TransitBus transport NYCT Bus: M55[3]
StructureUnderground
Levels2 (Manhattan Bridge platforms cross at an angle and under the other three lines)
Other information
OpenedSeptember 4, 1917; 105 years ago (1917-09-04) (connection between BMT Manhattan Bridge & Nassau St Lines)
January 16, 1978; 45 years ago (1978-01-16) (connection to IRT)[4]
AccessibleThis station is partially compliant with the Americans with Disabilities Act of 1990 Partially ADA-accessible (IRT Lexington Avenue Line platforms only)
Traffic
201915,861,864[5]Decrease 0.8%
Rank16 out of 424[5]
Location
Canal Street station (New York City Subway) is located in New York City Subway
Canal Street station (New York City Subway)
Canal Street station (New York City Subway) is located in New York City
Canal Street station (New York City Subway)
Canal Street station (New York City Subway) is located in New York
Canal Street station (New York City Subway)
Street map

Station service legend
Symbol Description
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops late nights only Stops late nights only
Stops rush hours in the peak direction only Stops rush hours in the peak direction only

The Canal Street station is a New York City Subway station complex. It is located in the Manhattan neighborhoods of Chinatown and SoHo, and is shared by the BMT Broadway Line, the IRT Lexington Avenue Line, and the BMT Nassau Street Line. It is served by the 6, J, N, and Q trains at all times; the R train at all times except late nights; the W train during weekdays; the train during weekdays in the peak direction; the Z train during rush hours in the peak direction; and the 4 train during late nights.

The complex comprises four stations, all named Canal Street; the Broadway Line's local and express tracks stop at separate sets of platforms. The Lexington Avenue Line platforms were built for the Interborough Rapid Transit Company (IRT), and was a local station on the city's first subway line. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The other three stations were built for the Brooklyn Rapid Transit Company (later the Brooklyn–Manhattan Transit Corporation, or BRT) as part of the Dual Contracts. The Nassau Street Line station opened on August 4, 1913; the Broadway Line express station opened on September 4, 1917; and the Broadway Line local station opened on January 5, 1918. The IRT station was connected to the BMT stations in 1978. Several modifications have been made over the years, including a full renovation between 1999 and 2004.

The Lexington Avenue Line station, under Lafayette Street, has two side platforms and four tracks; express trains use the inner two tracks to bypass the station. The Nassau Street Line station, under Centre Street, has two island platforms and three tracks, but only one platform and two tracks are in use. The Broadway local station, under Broadway, has two side platforms and four tracks, the inner two of which are not in use. The Broadway express station, under Canal Street, has two side platforms and two tracks, running at a lower level than the other three sets of platforms. The Lexington Avenue Line platforms contain elevators from the street, which make it compliant with the Americans with Disabilities Act of 1990, but the other platforms do not have elevator access.

Discover more about Canal Street station (New York City Subway) related topics

Chinatown, Manhattan

Chinatown, Manhattan

Manhattan's Chinatown is a neighborhood in Lower Manhattan, New York City, bordering the Lower East Side to its east, Little Italy to its north, Civic Center to its south, and Tribeca to its west. With an estimated population of 90,000 to 100,000 people, Chinatown is home to the highest concentration of Chinese people in the Western Hemisphere. Manhattan's Chinatown is also one of the oldest Chinese ethnic enclaves. The Manhattan Chinatown is one of nine Chinatown neighborhoods in New York City, as well as one of twelve in the New York metropolitan area, which contains the largest ethnic Chinese population outside of Asia, comprising an estimated 893,697 uniracial individuals as of 2017.

BMT Broadway Line

BMT Broadway Line

The BMT Broadway Line is a rapid transit line of the B Division of the New York City Subway in Manhattan. As of November 2016, it is served by four services, all colored yellow: the N and ​Q trains on the express tracks and the R and ​W trains on the local tracks during weekdays. The line is often referred to as the "N and R", since those were the only services on the line from 1988 to 2001, when the Manhattan Bridge's southern tracks were closed for rebuilding. The Broadway Line was built to give the Brooklyn Rapid Transit Company access to Midtown Manhattan.

BMT Nassau Street Line

BMT Nassau Street Line

The BMT Nassau Street Line is a rapid transit line of the B Division of the New York City Subway system in Manhattan. It is a continuation of the BMT Jamaica Line in Brooklyn after crossing the Williamsburg Bridge into Manhattan; it continues to a junction with the BMT Broadway Line just before the Montague Street Tunnel. Afterwards, the line reenters Brooklyn. Although the tracks continue past Broad Street, there has been no regular service past that station since June 25, 2010. While the line is officially recognized as the Nassau Street Line, it only serves one station on Nassau Street: Fulton Street.

6 (New York City Subway service)

6 (New York City Subway service)

The 6 Lexington Avenue Local and <6> Pelham Bay Park Express are two rapid transit services in the A Division of the New York City Subway. Their route emblems, or "bullets", are colored forest green since they use the IRT Lexington Avenue Line in Manhattan. Local service is denoted by a (6) in a circular bullet, and express service is denoted by a <6> in a diamond-shaped bullet.

4 (New York City Subway service)

4 (New York City Subway service)

The 4 Lexington Avenue Express is a rapid transit service in the A Division of the New York City Subway. Its route emblem, or "bullet", is colored forest green since it uses the IRT Lexington Avenue Line in Manhattan.

Brooklyn Rapid Transit Company

Brooklyn Rapid Transit Company

The Brooklyn Rapid Transit Company (BRT) was a public transit holding company formed in 1896 to acquire and consolidate railway lines in Brooklyn and Queens, New York City, United States. It was a prominent corporation and industry leader using the single-letter symbol B on the New York Stock Exchange.

Brooklyn–Manhattan Transit Corporation

Brooklyn–Manhattan Transit Corporation

The Brooklyn–Manhattan Transit Corporation (BMT) was an urban transit holding company, based in Brooklyn, New York City, United States, and incorporated in 1923. The system was sold to the city in 1940. Today, together with the IND subway system, it forms the B Division of the modern New York City Subway.

Dual Contracts

Dual Contracts

The Dual Contracts, also known as the Dual Subway System, were contracts for the construction and/or rehabilitation and operation of rapid transit lines in the City of New York. The contracts were signed on March 19, 1913, by the Interborough Rapid Transit Company and the Brooklyn Rapid Transit Company. As part of the Dual Contracts, the IRT and BRT would build or upgrade several subway lines in New York City, then operate them for 49 years.

Centre Street (Manhattan)

Centre Street (Manhattan)

Centre Street is a north–south street in the New York City borough of Manhattan, running through the Civic Center, Chinatown (曼哈頓華埠), and Little Italy neighborhoods of Lower Manhattan. It connects Park Row to the south with Spring Street to the north, where it merges with Lafayette Street. Centre Street carries northbound traffic north of Reade Street and two-way traffic between Reade Street and the Brooklyn Bridge.

Broadway (Manhattan)

Broadway (Manhattan)

Broadway is a road in the U.S. state of New York. Broadway runs from State Street at Bowling Green for 13 mi (21 km) through the borough of Manhattan and 2 mi (3.2 km) through the Bronx, exiting north from New York City to run an additional 18 mi (29 km) through the Westchester County municipalities of Yonkers, Hastings-On-Hudson, Dobbs Ferry, Irvington, and Tarrytown, and terminating north of Sleepy Hollow.

Canal Street (Manhattan)

Canal Street (Manhattan)

Canal Street is a major east–west street of over 1 mile (1.6 km) in Lower Manhattan, New York City, running from East Broadway between Essex and Jefferson Streets in the east, to West Street between Watts and Spring Streets in the west. It runs through the neighborhood of Chinatown, and forms the southern boundaries of SoHo and Little Italy as well as the northern boundary of Tribeca. The street acts as a major connector between Jersey City, New Jersey, via the Holland Tunnel (I-78), and Brooklyn in New York City via the Manhattan Bridge. It is a two-way street for most of its length, with two unidirectional stretches between Forsyth Street and the Manhattan Bridge.

Americans with Disabilities Act of 1990

Americans with Disabilities Act of 1990

The Americans with Disabilities Act of 1990 or ADA is a civil rights law that prohibits discrimination based on disability. It affords similar protections against discrimination to Americans with disabilities as the Civil Rights Act of 1964, which made discrimination based on race, religion, sex, national origin, and other characteristics illegal, and later sexual orientation and gender identity. In addition, unlike the Civil Rights Act, the ADA also requires covered employers to provide reasonable accommodations to employees with disabilities, and imposes accessibility requirements on public accommodations.

History

First subway

Planning for a subway line in New York City dates to 1864.[6]: 21  However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature authorized the Rapid Transit Act.[6]: 139–140  The subway plans were drawn up by a team of engineers led by William Barclay Parsons, chief engineer of the Rapid Transit Commission. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[7]: 3  A plan was formally adopted in 1897,[6]: 148  and all legal conflicts concerning the route alignment were resolved near the end of 1899.[6]: 161  The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[8] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[6]: 165  In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[7]: 4  Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[6]: 182 

The Canal Street station was constructed as part of the route segment from Chambers Street to Great Jones Street. Construction on this section of the line began on July 10, 1900, and was awarded to Degnon-McLean Contracting Company.[8] Near Canal Street the subway passed through quicksand and a drainage sewer; this was near the location of the old Collect Pond.[9][10]: 230  The sewer, built to drain the Collect Pond, originally continued west to the Hudson River; with the IRT's construction, the sewer was redirected east into the East River. The new brick sewer was circular and measured five and a half feet across.[10]: 240  Pumps were used to keep the excavation clear of water while the work proceeded.[6]: 267  By late 1903, the subway was nearly complete, but the IRT Powerhouse and the system's electrical substations were still under construction, delaying the system's opening.[6]: 186 [11]

The Canal Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway from City Hall to 145th Street on the Broadway–Seventh Avenue Line.[12][6]: 186  After the first subway line was completed in 1908,[13] the station was served by local trains along both the West Side (now the Broadway–Seventh Avenue Line to Van Cortlandt Park–242nd Street) and East Side (now the Lenox Avenue Line). West Side local trains had their southern terminus at City Hall during rush hours and South Ferry at other times, and had their northern terminus at 242nd Street. East Side local trains ran from City Hall to Lenox Avenue (145th Street).[14]

To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening platforms at stations along the original IRT subway.[15]: 168  As part of a modification to the IRT's construction contracts, made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $43.6 million in 2021) spent on platform lengthening, $500,000 (equivalent to $14,541,000 in 2021) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[16]: 15  Platforms at local stations, such as the Canal Street station, were lengthened by between 20 to 30 feet (6.1 to 9.1 m). Both platforms were extended to the north and south.[16]: 107  Six-car local trains began operating in October 1910.[15]: 168 

Dual Contracts

After the original IRT opened, the city began planning new lines. The Centre Street Loop (later the Nassau Street Line), approved on January 25, 1907, as a four-track line,[17] was to connect the Brooklyn Bridge, Manhattan Bridge, and Williamsburg Bridge via Centre Street, Canal Street, and Delancey Street.[18] Construction contracts for the Nassau Street Line were awarded in early 1907.[6]: 203  The New York Public Service Commission also adopted plans for what was known as the Broadway–Lexington Avenue route (later the Broadway Main Line) on December 31, 1907.[6]: 212  A proposed Tri-borough system was adopted in early 1908, combining the Broadway–Lexington Avenue and Nassau Street lines; a Canal Street subway from the Fourth Avenue Subway in Brooklyn via the Manhattan Bridge to the Hudson River; and several other lines in Brooklyn. The lines were assigned to the Brooklyn Rapid Transit Company (BRT) in the Dual Contracts, adopted on March 4, 1913.[6]: 203–219 [19] The IRT made a failed proposal for the Canal Street subway in 1909.[6]: 219 

The Centre Street Loop station, including a bridge over the Canal Street subway, was completed at the end of 1909. The station remained closed because the Chambers Street station, the terminal for the Centre Street Loop, was not complete.[20] The BRT submitted a proposal to the Commission, dated March 2, 1911, to operate the Tri-borough system (but under Church Street instead of Greenwich Street), as well as a branch along Broadway, Seventh Avenue, and 59th Street from Ninth Street north and east to the Queensboro Bridge. The Canal Street subway was to merge with the Broadway Line instead of continuing to the Hudson River.[6]: 225  In the old plan, the Broadway Main Line's center tracks were to have continued up Broadway, fed by traffic from Brooklyn and the Montague Street Tunnel. Local service was to have terminated at the upper level of the Broadway Line's City Hall station, with express service using City Hall's upper level. The new plan favored local service via City Hall's upper level and express service via the Manhattan Bridge; the center tracks of the Main Line station were abandoned, as they would feed into the unused lower level platforms at City Hall. Two segments of the Broadway Line around Canal Street were placed under contract early in 1912. The contract for Section 2, between Murray Street and Canal Street, was awarded to the Degnon Contracting Company that January. Two months later, the contract for Section 2A, between Canal and Howard Streets, was contracted to the O'Rourke Engineering Construction Company.[6]: 225 

The Nassau Street Line platforms opened on August 4, 1913, providing service to northern Brooklyn via the Williamsburg Bridge.[6]: 249 [21] The Bridge Line platforms opened on September 4, 1917, as part of the first section of the Broadway Line from Canal Street to 14th Street–Union Square.[22] On January 5, 1918, the Main Line platforms opened when the Broadway Line was extended north to Times Square–42nd Street and south to Rector Street.[23] The Lexington Avenue Line opened north of Grand Central–42nd Street in 1918, thereby dividing the original line into an "H"-shaped system. All local trains were sent via the Lexington Avenue Line, running along the Pelham Line in the Bronx.[24]

In December 1922, the Transit Commission approved a $3 million project to lengthen platforms at 14 local stations along the original IRT line, including Canal Street and seven other stations on the Lexington Avenue Line. Platform lengths at these stations would be increased from 225 to 436 feet (69 to 133 m).[25][26] The commission postponed the platform-lengthening project in September 1923, at which point the cost had risen to $5.6 million.[27][28]

Modifications and transfers

The city government took over the BMT's operations on June 1, 1940,[29][30] and the IRT's operations on June 12, 1940.[31][32] In late 1959, contracts were awarded to extend the platforms at Bowling Green, Wall Street, Fulton Street, Canal Street, Spring Street, Bleecker Street, Astor Place, Grand Central–42nd Street, 86th Street, and 125th Street to 525 feet (160 m).[33] In April 1960, work began on a $3,509,000 project (equivalent to $32.1 million in 2021) to lengthen platforms at seven of these stations to accommodate ten-car trains. The northbound platforms at Canal Street, Spring Street, Bleecker Street, and Astor Place were lengthened from 225 to 525 feet (69 to 160 m); the platform extensions at these stations opened on February 19, 1962.[34]

In the late 1960s, New York City Transit extended the Broadway Main Line platforms for ten-car trains. The Broadway Main Line and Bridge Line stations were overhauled in the late 1970s. The original trim lines were replaced with white cinderblock tiles, except for small recesses in the walls, which contained blue-painted cinderblock tiles. The staircases were repaired and new platform edges were installed. The blue cinderblock field contained the station-name signs and white text pointing to the exits. The renovation also replaced incandescent lighting with fluorescent lighting.

On January 16, 1978, the transfer between the Lexington Avenue Line and the BMT platforms was placed inside fare control.[4]

With the exception of three months in 1990, train service to the Bridge Line platforms was suspended from 1988 to 2001 during the Manhattan Bridge reconstruction project. The platforms remained open for passengers transferring between the other routes, since they were the only connections between the other platforms in the complex. Service between Manhattan and Brooklyn was redirected to the Main Line platforms and used the Montague Street Tunnel. The three-month period was supposed to have allowed train service while work on the bridge was not being done, but on December 27, 1990, the discovery of missing steel plates and corrosion that threatened the bridge's integrity halted this service.[35][36] In 1997, a temporary art exhibit known as the Canal Street Canal by Alexander Brodsky, was installed on the northbound trackway. It consisted of a large waterproof tub filled with water, with Venetian canal boats floating inside.[37]

Bilingual signage; a common sight to the station prior to renovations.
Bilingual signage; a common sight to the station prior to renovations.

The complex was fully renovated between 1999 and 2004. The original mosaics on the Broadway Main Line were uncovered but then either removed or covered over again. One of the original tablets has been preserved at the New York Transit Museum. In 2001, the Broadway Main Line station received a major overhaul before the Bridge level reopened on July 22, 2001. Among the repairs included the staircases, re-tiling for the walls, new tiling on the floors, upgrading the station's lights and the public address system, installing ADA yellow safety treads along the platform edges, new signs, and new track beds in both directions. During the renovation, elevators were installed to the Lexington Avenue Line platforms, making them compliant with the Americans with Disabilities Act of 1990.

Discover more about History related topics

Early history of the IRT subway

Early history of the IRT subway

The first regularly operated subway in New York City was opened on October 27, 1904, and was operated by the Interborough Rapid Transit Company (IRT). The early IRT system consisted of a single trunk line below 96th Street in Manhattan, running under Broadway, 42nd Street, Park Avenue, and Lafayette Street. The line had three northern branches in Upper Manhattan and the Bronx, and a southern branch to Brooklyn. The system had four tracks between Brooklyn Bridge–City Hall and 96th Street, allowing for local and express service. The original line and early extensions consisted of:The IRT Eastern Parkway Line from Atlantic Avenue–Barclays Center to Borough Hall The IRT Lexington Avenue Line from Borough Hall to Grand Central–42nd Street The IRT 42nd Street Shuttle from Grand Central–42nd Street to Times Square The IRT Broadway–Seventh Avenue Line from Times Square to Van Cortlandt Park–242nd Street The IRT Lenox Avenue Line from 96th Street to 145th Street The IRT White Plains Road Line from 142nd Street Junction to 180th Street–Bronx Park

New York City Hall

New York City Hall

New York City Hall is the seat of New York City government, located at the center of City Hall Park in the Civic Center area of Lower Manhattan, between Broadway, Park Row, and Chambers Street. Constructed from 1803 to 1812, the building is the oldest city hall in the United States that still houses its original governmental functions, such as the office of the Mayor of New York City and the chambers of the New York City Council. While the Mayor's Office is in the building, the staff of thirteen municipal agencies under mayoral control are located in the nearby Manhattan Municipal Building, one of the largest government buildings in the world, with many others housed in various buildings in the immediate vicinity.

Lower Manhattan

Lower Manhattan

Lower Manhattan, also known as Downtown Manhattan or Downtown New York City, is the southernmost part of Manhattan, the central borough for business, culture, and government in New York City, which is the most populated city in the United States with over 8.8 million residents as of the 2020 census.

John B. McDonald

John B. McDonald

John B. McDonald was an Irish-born contractor who is best known for overseeing construction of the first New York City Subway line from 1900 to 1904.

August Belmont Jr.

August Belmont Jr.

August Belmont Jr. was an American financier. He financed the construction of the original New York City subway (1900–1904) and for many years headed the Interborough Rapid Transit Company, which ran the transit system. He also financed and led the construction of the Cape Cod Canal in Massachusetts, which opened in 1914. Belmont bought the land for and built New York's Belmont Park racetrack—named for his father—and was a major owner/breeder of thoroughbred racehorses. He served as chairman of the board of the Louisville and Nashville Railroad. He also served as a director of the Southern Pacific Co., parent of the railroad, and National Park Bank.

Heins & LaFarge

Heins & LaFarge

Heins & LaFarge was a New York-based architectural firm composed of the Philadelphia-born architect George Lewis Heins (1860–1907) and Christopher Grant LaFarge (1862–1938), the eldest son of the artist John La Farge. They were responsible for the original Romanesque-Byzantine east end and crossing of the Cathedral of St. John the Divine, New York, and for the original Astor Court buildings of the Bronx Zoo, which formed a complete ensemble reflecting the aesthetic of the City Beautiful movement. Heins & LaFarge provided the architecture and details for the Interborough Rapid Transit Company, the first precursor to the New York City Subway.

Interborough Rapid Transit Company

Interborough Rapid Transit Company

The Interborough Rapid Transit Company (IRT) was the private operator of New York City's original underground subway line that opened in 1904, as well as earlier elevated railways and additional rapid transit lines in New York City. The IRT was purchased by the city in June 1940, along with the younger BMT and IND systems, to form the modern New York City Subway. The former IRT lines are now the A Division or IRT Division of the Subway.

Collect Pond

Collect Pond

Collect Pond, or Fresh Water Pond, was a body of fresh water in what is now Chinatown in Lower Manhattan, New York City. For the first two centuries of European settlement in Manhattan, it was the main New York City water supply system for the growing city. The former pond became the site of a jail and is now a city park, Collect Pond Park, which includes a pond evocative of its former status.

IRT Powerhouse

IRT Powerhouse

The IRT Powerhouse, also known as the Interborough Rapid Transit Company Powerhouse, is a former power station of the Interborough Rapid Transit Company (IRT), which operated the New York City Subway's first line. The building fills a block bounded by 58th Street, 59th Street, Eleventh Avenue, and Twelfth Avenue in the Hell's Kitchen and Riverside South neighborhoods of Manhattan.

Electrical substation

Electrical substation

A substation is a part of an electrical generation, transmission, and distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several other important functions. Between the generating station and consumer, electric power may flow through several substations at different voltage levels. A substation may include transformers to change voltage levels between high transmission voltages and lower distribution voltages, or at the interconnection of two different transmission voltages. They are a common component of the infrastructure, for instance there are 55,000 substations in the United States.

IRT Broadway–Seventh Avenue Line

IRT Broadway–Seventh Avenue Line

The IRT Broadway–Seventh Avenue Line is a New York City Subway line. It is one of several lines that serves the A Division, stretching from South Ferry in Lower Manhattan north to Van Cortlandt Park–242nd Street in Riverdale, Bronx. The Brooklyn Branch, known as the Wall and William Streets Branch during construction, from the main line at Chambers Street southeast through the Clark Street Tunnel to Borough Hall in Downtown Brooklyn, is also part of the Broadway–Seventh Avenue Line. The IRT Broadway–Seventh Avenue Line is the only line to have elevated stations in Manhattan, with two short stretches of elevated track at 125th Street and between Dyckman and 225th Streets.

IRT Lenox Avenue Line

IRT Lenox Avenue Line

The Lenox Avenue Line is a line of the New York City Subway, part of the A Division, mostly built as part of the first subway line. Located in Manhattan, New York City, it consists of six stations between Central Park North–110th Street and Harlem–148th Street, all of which are situated within the neighborhood of Harlem in Upper Manhattan.

Station layout

G Street level Exit/entrance
Disabled access Elevators at northeast corner of Canal Street and Lafayette Street for northbound "4" train"6" train"6" express train service, and at northwest corner for southbound "4" train"6" train"6" express train service
B1 Side platform Disabled access
Northbound local "6" train"6" express train toward Pelham Bay Park or Parkchester (Spring Street)
"4" train toward Woodlawn late nights (Spring Street)
Northbound express "4" train"5" train do not stop here
Southbound express "4" train"5" train do not stop here →
Southbound local "6" train"6" express train toward Brooklyn Bridge–City Hall (Terminus)
"4" train toward New Lots Avenue late nights (Brooklyn Bridge–City Hall)
(No service: Worth Street)
Side platform Disabled access
Eastbound No regular service
Island platform, not in service
Eastbound Trackbed
Eastbound
(former westbound)
"J" train toward Jamaica Center–Parsons/Archer (Bowery)
"Z" train PM rush toward Jamaica Center–Parsons/Archer (Bowery)
Island platform
Westbound "J" train toward Broad Street (Chambers Street)
"Z" train AM rush toward Broad Street (Chambers Street)
B2 Side platform
Northbound "R" train toward Forest Hills–71st Avenue (Prince Street)
"W" train toward Astoria–Ditmars Boulevard weekdays (Prince Street)
"N" train toward Astoria–Ditmars Boulevard late nights (Prince Street)
Center track City Hall layup track
Center track City Hall layup track
Southbound "R" train toward Bay Ridge–95th Street (City Hall)
"W" train toward Whitehall Street–South Ferry weekdays (City Hall)
"N" train toward Coney Island–Stillwell Avenue via Sea Beach late nights (City Hall)
Side platform
B3 Side platform
Northbound "N" train toward Astoria–Ditmars Boulevard (Prince Street weekends, 14th Street–Union Square weekdays)
"Q" train toward 96th Street (Prince Street late nights, 14th Street–Union Square other times)
Southbound "N" train toward Coney Island–Stillwell Avenue via Sea Beach (Atlantic Avenue–Barclays Center)
"Q" train toward Coney Island–Stillwell Avenue via Brighton (DeKalb Avenue)
(Demolished: Myrtle Avenue)
Side platform

The complex consists of four originally separate stations joined by underground passageways. Three of the four are perpendicular to Canal Street, crossing at Broadway (Broadway Main Line), Lafayette Street (Lexington Avenue Line) and Centre Street (Nassau Street Line). The Broadway-Manhattan Bridge Line platforms are directly underneath Canal Street itself. The Bridge Line platforms serve as transfer passageways between all other lines. After leaving Canal Street, the Manhattan Bridge Line makes a hard right onto Broadway.

Some relative depths of the stations in the Canal Street complex are as follows:

Exits

The complex has a total of 13 staircase entrances and 2 separate elevator entrances for the Lexington Avenue Line's platforms. From the Broadway Main Line platforms, there are two staircases to each of the northwestern, southeastern, and southwestern corners. There is also a staircase to the northeastern corner of Broadway and Canal Street. There is a staircase from the Nassau Street Line to the southwestern corner of Centre Street and Canal Street. The Broadway Bridge Line platform exits are also used by the Lexington Avenue Line platforms. Three staircases from the northbound Lexington Avenue Line platform lead to the eastern corners of Lafayette Street and Canal Street, with one to the northeast corner and two to the southeast corner. From the southbound Lexington Avenue Line platform there are staircases to the western corners of Lafayette Street and Canal Street. There are two elevators that make the Lexington Avenue Line station ADA-accessible. The northbound platform's elevator leads to the northeastern corner of that intersection, while the southbound platform's elevator leads to the northwestern corner.[38]

Because the elevators are outside fare control, there is no free ADA-accessible transfer between the northbound and the southbound platforms; however, both of the IRT platforms are connected to the BMT Bridge Line platforms, and thus to each other and to the rest of the complex, via stairways.

The BMT Nassau Street Line platforms had two additional exits. One exit was accessible only from the now-abandoned eastern platform and had two staircases to the southeastern corner of Canal Street and Centre Street.[39] The other exit, now converted to an emergency exit and crew rooms, is accessible from the passageway to the abandoned platform from the northbound BMT Broadway Line express platform. This exit leads to the northeastern corner of Canal Street and Centre Street, and features a provision for an escalator.

Discover more about Station layout related topics

Accessibility

Accessibility

Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" and "indirect access" meaning compatibility with a person's assistive technology.

4 (New York City Subway service)

4 (New York City Subway service)

The 4 Lexington Avenue Express is a rapid transit service in the A Division of the New York City Subway. Its route emblem, or "bullet", is colored forest green since it uses the IRT Lexington Avenue Line in Manhattan.

6 (New York City Subway service)

6 (New York City Subway service)

The 6 Lexington Avenue Local and <6> Pelham Bay Park Express are two rapid transit services in the A Division of the New York City Subway. Their route emblems, or "bullets", are colored forest green since they use the IRT Lexington Avenue Line in Manhattan. Local service is denoted by a (6) in a circular bullet, and express service is denoted by a <6> in a diamond-shaped bullet.

Side platform

Side platform

A side platform is a platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or transitway. A station having dual side platforms, one for each direction of travel, is the basic design used for double-track railway lines. Side platforms may result in a wider overall footprint for the station compared with an island platform where a single width of platform can be shared by riders using either track.

Pelham Bay Park station

Pelham Bay Park station

The Pelham Bay Park station is the northern terminal station of the IRT Pelham Line of the New York City Subway. Located across from Pelham Bay Park, at the intersection of the Bruckner Expressway and Westchester Avenue in the Pelham Bay neighborhood of the Bronx, it is served by the 6 train at all times, except weekdays in the peak direction, when the <6> serves it.

Parkchester station

Parkchester station

The Parkchester station is an express station on the IRT Pelham Line of the New York City Subway. It is located above Hugh J. Grant Circle in the Parkchester neighborhood of the Bronx, where East 177th Street, Metropolitan Avenue, and Westchester Avenue intersect. The station is served by the 6 train at all times and the <6> train during weekdays in the peak direction.

Spring Street station (IRT Lexington Avenue Line)

Spring Street station (IRT Lexington Avenue Line)

The Spring Street station is a local station on the IRT Lexington Avenue Line of the New York City Subway. Located at the intersection of Lafayette Street and Spring Street in SoHo and Little Italy, Manhattan, it is served by 6 trains at all times, <6> trains during weekdays in the peak direction, and 4 trains during late night hours.

Woodlawn station (IRT Jerome Avenue Line)

Woodlawn station (IRT Jerome Avenue Line)

The Woodlawn station is the northern terminal of the New York City Subway's IRT Jerome Avenue Line. The station is located at the intersection of Bainbridge and Jerome Avenues, outside Woodlawn Cemetery. Despite the station name, this intersection is in the Norwood section of the Bronx, and not in Woodlawn. It is served by the 4 train at all times. This station was constructed by the Interborough Rapid Transit Company as part of the Dual Contracts and opened in 1918.

5 (New York City Subway service)

5 (New York City Subway service)

The 5 Lexington Avenue Express is a rapid transit service in the A Division of the New York City Subway. Its route emblem, or "bullet", is colored forest green since it uses the IRT Lexington Avenue Line in Manhattan.

IRT Lexington Avenue Line platforms

The Canal Street station on the IRT Lexington Avenue Line is a local station that has four tracks and two side platforms. The 6 stops here at all times,[41] rush-hour and midday trains stop here in the peak direction;[41] and the 4 stops here during late nights.[42] The two express tracks are used by the 4 and 5 trains during daytime hours.[43] The platforms were originally 200 feet (61 m) long, as at other local stations on the original IRT,[7]: 4 [44]: 8  but, as a result of the 1959 platform extensions, became 525 feet (160 m) long.[33] The platform extensions are at the north ends of the original platforms.[44]: 32 

As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method.[10]: 237  The tunnel is covered by a "U"-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than 4 inches (100 mm) thick.[44]: 9  Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The platforms contain columns with white glazed tiles, spaced every 15 feet (4.6 m). Additional columns between the tracks, spaced every 5 feet (1.5 m), support the jack-arched concrete station roofs.[7]: 4 [44]: 9  There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.[44]: 9 

The original decorative scheme consisted of blue/green tile station-name tablets, green tile bands, a buff terracotta cornice, and green terracotta plaques.[44]: 32  The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[44]: 31  The decorative work was performed by tile contractor Manhattan Glass Tile Company and terracotta contractor Atlantic Terra Cotta Company.[44]: 32  The ceilings of the original platforms and fare control areas contain plaster molding.[44]: 10  The newer portion has 1950s green tile at the end of the platforms. There are also Independent Subway System (IND)-type "To Canal Street" signs. New lights were installed. Non-original name tables and small "C" mosaics exist.

Image gallery

Discover more about IRT Lexington Avenue Line platforms related topics

IRT Lexington Avenue Line

IRT Lexington Avenue Line

The IRT Lexington Avenue Line is one of the lines of the A Division of the New York City Subway, stretching from Lower Manhattan north to 125th Street in East Harlem. The line is served by the 4, ​5, ​6, and <6> trains.

Metro station

Metro station

A metro station or subway station is a train station for a rapid transit system, which as a whole is usually called a "metro" or "subway". A station provides a means for passengers to purchase tickets, board trains, and evacuate the system in the case of an emergency. In the United Kingdom, they are known as underground stations, most commonly used in reference to the London Underground.

Side platform

Side platform

A side platform is a platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or transitway. A station having dual side platforms, one for each direction of travel, is the basic design used for double-track railway lines. Side platforms may result in a wider overall footprint for the station compared with an island platform where a single width of platform can be shared by riders using either track.

6 (New York City Subway service)

6 (New York City Subway service)

The 6 Lexington Avenue Local and <6> Pelham Bay Park Express are two rapid transit services in the A Division of the New York City Subway. Their route emblems, or "bullets", are colored forest green since they use the IRT Lexington Avenue Line in Manhattan. Local service is denoted by a (6) in a circular bullet, and express service is denoted by a <6> in a diamond-shaped bullet.

4 (New York City Subway service)

4 (New York City Subway service)

The 4 Lexington Avenue Express is a rapid transit service in the A Division of the New York City Subway. Its route emblem, or "bullet", is colored forest green since it uses the IRT Lexington Avenue Line in Manhattan.

5 (New York City Subway service)

5 (New York City Subway service)

The 5 Lexington Avenue Express is a rapid transit service in the A Division of the New York City Subway. Its route emblem, or "bullet", is colored forest green since it uses the IRT Lexington Avenue Line in Manhattan.

Foundation (engineering)

Foundation (engineering)

In engineering, a foundation is the element of a structure which connects it to the ground, transferring loads from the structure to the ground. Foundations are generally considered either shallow or deep. Foundation engineering is the application of soil mechanics and rock mechanics in the design of foundation elements of structures.

Concrete

Concrete

Concrete is a composite material composed of fine and coarse aggregate bonded together with a fluid cement that hardens (cures) over time. Concrete is the second-most-used substance in the world after water, and is the most widely used building material. Its usage worldwide, ton for ton, is twice that of steel, wood, plastics, and aluminium combined. Globally, the ready-mix concrete industry, the largest segment of the concrete market, is projected to exceed $600 billion in revenue by 2025. This widespread use results in a number of environmental impacts. Most notably, the production process for cement produces large volumes of greenhouse gas emissions, leading to net 8% of global emissions. Other environmental concerns include widespread illegal sand mining, impacts on the surrounding environment such as increased surface runoff or urban heat island effect, and potential public health implications from toxic ingredients. Significant research and development is being done to try to reduce the emissions or make concrete a source of carbon sequestration, and increase recycled and secondary raw materials content into the mix to achieve a circular economy. Concrete is expected to be a key material for structures resilient to climate disasters, as well as a solution to mitigate the pollution of other industries, capturing wastes such as coal fly ash or bauxite tailings and residue.

Jack arch

Jack arch

A jack arch is a structural element in masonry construction that provides support at openings in the masonry. Alternate names are "flat arch" and "straight arch".

Buff (colour)

Buff (colour)

Buff is a light brownish yellow, ochreous colour, typical of buff leather. Buff is a mixture of yellow ochre and white: two parts of white lead and one part of yellow ochre produces a good buff, or white lead may be tinted with French ochre alone.

Atlantic Terra Cotta Company

Atlantic Terra Cotta Company

The Atlantic Terra Cotta Company, established in 1846 as A. Hall and Sons Terra Cotta, was founded in Perth Amboy, New Jersey due to Perth Amboy's rich supplies of clay. It was one of the first successful terra cotta companies in the United States. Originally, the company produced porcelain and household wares but transitioned to terra cotta items. The company, always located at 59 Buckingham Avenue, changed its name to the Perth Amboy Terra Cotta Company and then to Atlantic Terra Cotta which, as the preeminent architectural terra cotta producer in the United States, went on to produce in its kilns the terra cotta for such notable buildings as the United States Supreme Court, the Philadelphia Museum of Art, and the Woolworth Building.

Independent Subway System

Independent Subway System

The Independent Subway System, formerly known as the Independent City-Owned Subway System (ICOSS) or the Independent City-Owned Rapid Transit Railroad (ICORTR), was a rapid transit rail system in New York City that is now part of the New York City Subway. It was first constructed as the Eighth Avenue Line in Manhattan in 1932.

BMT Nassau Street Line platforms

The Canal Street station on the BMT Nassau Street Line has three tracks and two island platforms, but only the western island platform is accessible to passengers. The J stops here at all times and the Z stops here during rush hours in the peak direction.[46]

Formerly, Canal Street resembled a typical express station, except that the inner tracks dead-ended at bumper blocks at the south end with a platform-level connection joining the southern ends of the two platforms. These stub-end tracks were last used prior to 1994, when the station served as the southern terminus for weekend J. After a reconfiguration of the Nassau Street Line in 2004, the eastern (former "northbound") platforms were abandoned and the platform-level connection was removed, allowing the former southbound express track to continue south. The westernmost (former "southbound") platform remains in operation and both tracks provide through service with southbound traffic using the former southbound "local" track and northbound traffic using the former southbound "express" track.

The former northbound local track is now used only for non-revenue moves, train storage and emergencies while the northbound express stub track was removed. The former northbound "local" track merges with the former southbound "express" track (now the northbound track) south of the station.[43]

There was an opening in the center wall about 50 feet (15 m) from the end of the station[47] that had a narrow platform, which was used by train crews to cross between trains on the center tracks. In 2004, this opening was sealed with new tiling as the eastern platform was in the process of being closed.

South of this station there are unused stub tracks that lead from Chambers Street and used to connect to the southern tracks of the Manhattan Bridge.[48] These tracks were disconnected with the opening of the Chrystie Street Connection in 1967 and now end at bumper blocks.[49]

Abandoned platform, as seen through the dividing wall.
Abandoned platform, as seen through the dividing wall.

Discover more about BMT Nassau Street Line platforms related topics

Island platform

Island platform

An island platform is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway interchange. Island platforms are popular on twin-track routes due to pragmatic and cost reasons. They are also useful within larger stations where local and express services for the same direction of travel can be provided from opposite sides of the same platform thereby simplifying transfers between the two tracks. An alternative arrangement is to position side platforms on either side of the tracks. The historical use of island platforms depends greatly upon the location. In the United Kingdom the use of island platforms is relatively common when the railway line is in a cutting or raised on an embankment, as this makes it easier to provide access to the platform without walking across the tracks.

Manhattan Bridge

Manhattan Bridge

The Manhattan Bridge is a suspension bridge that crosses the East River in New York City, connecting Lower Manhattan at Canal Street with Downtown Brooklyn at the Flatbush Avenue Extension. The main span is 1,480 ft (451 m) long, with the suspension cables being 3,224 ft (983 m) long. The bridge's total length is 6,855 ft (2,089 m). It is one of four toll-free vehicular bridges connecting Manhattan Island to Long Island; the nearby Brooklyn Bridge is just slightly further downtown, while the Queensboro and Williamsburg bridges are to the north.

Chrystie Street Connection

Chrystie Street Connection

The Chrystie Street Connection is a set of New York City Subway tunnels running the length of Chrystie Street on the Lower East Side of Manhattan. It is one of the few track connections between lines of the former Brooklyn–Manhattan Transit Corporation (BMT) and Independent Subway System (IND) divisions, which together constitute the system's B Division. A major branch of the IND Sixth Avenue Line, it connects the Sixth Avenue Line to the BMT Brighton Line and BMT Fourth Avenue Line via the north side of the Manhattan Bridge and to the BMT Jamaica Line over the Williamsburg Bridge. The project, opened in 1967 and 1968, also includes the Sixth Avenue Line's Grand Street and 57th Street stations, the latter of which is not part of the connection itself.

BMT Broadway Line platforms

The four platforms of Canal Street station, located on two levels, are depicted as the same station by the MTA on maps, but contain two distinct station codes. Both are a part of the BMT Broadway Line. The upper level, the Main Line platforms, is for local trains traveling to Lower Manhattan and Brooklyn via the Montague Street Tunnel. The lower level, the Bridge Line platforms, is for express trains to and from the Manhattan Bridge.

In an art installation entitled Empress Voyage February 22, 1794 (1998) by Bing Lee, the platforms feature mosaics containing Chinese characters, reflecting the station's location in Chinatown. The symbols on the red wall plaques mean "money" and "luck" and the "Canal Street" name tablet has ideographs that read "China" and "Town." The platform walls also feature the station's name translated into Chinese characters (Chinese: 堅尼街華埠; pinyin: Jiān ní jiē huá bù)

Main Line platforms (upper level)

The Canal Street station on the Main Line has four tracks and two side platforms. The outer local tracks, the only ones to stop at this station, provide through service via the Montague Street Tunnel. The R stops here at all times except late nights,[52] when it is replaced by the N.[53] The W stops here during weekdays.[54]

The center tracks, which have never seen revenue service, begin at the unused lower level of City Hall and run north to here, dead-ending at bumper blocks about two-thirds of the way through. The center tracks can be used for layups, but this use has been completely made redundant with the nearby City Hall lower level being used as a layup yard instead.[43]

Bridge Line platforms (lower level)

The Canal Street station on the Manhattan Bridge route has two tracks and two side platforms. When it originally opened, this station was known as Broadway. The N stops here at all times except late nights,[53] while the Q stops here at all times.[57] Although technically located on the BMT Broadway Line, it was originally a distinct station from the main line, as the two stations were not directly connected. It is located on the lower level and oriented perpendicular to the other portions of the complex.

The original tile on this station read simply "Broadway" and there was a small either wood or metal sign attached to the wall beneath the tile name that read "Canal Street."

West of the station, the bridge tracks curve to the north, and ramp up between the tracks from the local upper level platform to form the express tracks. The tunnel continues straight ahead, past the diverge to the main line. The bellmouths going westward from the west end of the station are a provision from the original plans and run for about 100 feet (30 m). Sitting on one of the trackways is a storage building.

East of the station, the tracks cross the south side of the Manhattan Bridge to enter Brooklyn. There are disused trackways leading to the north side tracks of the bridge, which trains from these platforms used to travel on. These tracks were disconnected with the opening of the Chrystie Street Connection in 1967 and no longer have rails or any other infrastructure.[49]

Artwork detail

Discover more about BMT Broadway Line platforms related topics

Metropolitan Transportation Authority

Metropolitan Transportation Authority

The Metropolitan Transportation Authority (MTA) is a public benefit corporation responsible for public transportation in the New York City metropolitan area of the U.S. state of New York. The MTA is the largest public transit authority in the United States, serving 12 counties in Downstate New York, along with two counties in southwestern Connecticut under contract to the Connecticut Department of Transportation, carrying over 11 million passengers on an average weekday systemwide, and over 850,000 vehicles on its seven toll bridges and two tunnels per weekday.

BMT Broadway Line

BMT Broadway Line

The BMT Broadway Line is a rapid transit line of the B Division of the New York City Subway in Manhattan. As of November 2016, it is served by four services, all colored yellow: the N and ​Q trains on the express tracks and the R and ​W trains on the local tracks during weekdays. The line is often referred to as the "N and R", since those were the only services on the line from 1988 to 2001, when the Manhattan Bridge's southern tracks were closed for rebuilding. The Broadway Line was built to give the Brooklyn Rapid Transit Company access to Midtown Manhattan.

Montague Street Tunnel

Montague Street Tunnel

The Montague Street Tunnel is a rail tunnel of the New York City Subway under the East River between the boroughs of Manhattan and Brooklyn, connecting the BMT Broadway Line and BMT Fourth Avenue Line. The R uses the tunnel at all times, the N uses it during late nights, and during rush hours, several W trains per day in each direction use the tunnel.

Manhattan Bridge

Manhattan Bridge

The Manhattan Bridge is a suspension bridge that crosses the East River in New York City, connecting Lower Manhattan at Canal Street with Downtown Brooklyn at the Flatbush Avenue Extension. The main span is 1,480 ft (451 m) long, with the suspension cables being 3,224 ft (983 m) long. The bridge's total length is 6,855 ft (2,089 m). It is one of four toll-free vehicular bridges connecting Manhattan Island to Long Island; the nearby Brooklyn Bridge is just slightly further downtown, while the Queensboro and Williamsburg bridges are to the north.

Chinese language

Chinese language

Chinese is a group of languages spoken natively by the ethnic Han Chinese majority and many minority ethnic groups in Greater China. About 1.3 billion people speak a variety of Chinese as their first language.

Traditional Chinese characters

Traditional Chinese characters

Traditional Chinese characters are one type of standard Chinese character sets of the contemporary written Chinese. The traditional characters had taken shapes since the clerical change and mostly remained in the same structure they took at the introduction of the regular script in the 2nd century. Over the following centuries, traditional characters were regarded as the standard form of printed Chinese characters or literary Chinese throughout the Sinosphere until the middle of the 20th century, before different script reforms initiated by countries using Chinese characters as a writing system.

Pinyin

Pinyin

Hanyu Pinyin, often shortened to just pinyin, is the official romanization system for Standard Mandarin Chinese in China, and to some extent, in Singapore and Malaysia. It is often used to teach Mandarin, normally written in Chinese form, to learners already familiar with the Latin alphabet. The system includes four diacritics denoting tones, but pinyin without tone marks is used to spell Chinese names and words in languages written in the Latin script, and is also used in certain computer input methods to enter Chinese characters. The word Hànyǔ literally means "Han language", while Pīnyīn (拼音) means "spelled sounds".

Side platform

Side platform

A side platform is a platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or transitway. A station having dual side platforms, one for each direction of travel, is the basic design used for double-track railway lines. Side platforms may result in a wider overall footprint for the station compared with an island platform where a single width of platform can be shared by riders using either track.

R (New York City Subway service)

R (New York City Subway service)

The R Broadway/Fourth Avenue Local is a rapid transit service in the B Division of the New York City Subway. Its route emblem, or "bullet", is colored yellow since it uses the BMT Broadway Line in Manhattan.

N (New York City Subway service)

N (New York City Subway service)

The N Broadway Express is a rapid transit service in the B Division of the New York City Subway. Its route emblem, or "bullet," is colored yellow, since it uses the BMT Broadway Line in Manhattan.

Q (New York City Subway service)

Q (New York City Subway service)

The Q Second Avenue/Broadway Express/Brighton Local is a rapid transit service in the B Division of the New York City Subway. Its route emblem, or "bullet", is colored yellow since it uses the BMT Broadway Line in Manhattan.

Brooklyn

Brooklyn

Brooklyn is a borough of New York City, coextensive with Kings County, in the U.S. state of New York. Kings County is the most populous county in the State of New York, and the second-most densely populated county in the United States, behind New York County (Manhattan). Brooklyn is also New York City's most populous borough, with 2,736,074 residents in 2020.

Source: "Canal Street station (New York City Subway)", Wikipedia, Wikimedia Foundation, (2023, March 12th), https://en.wikipedia.org/wiki/Canal_Street_station_(New_York_City_Subway).

Enjoying Wikiz?

Enjoying Wikiz?

Get our FREE extension now!

References
  1. ^ "Borough of Manhattan, New York City". Government of New York City. Retrieved December 28, 2020.
  2. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  3. ^ "Manhattan Bus Map" (PDF). Metropolitan Transportation Authority. July 2019. Retrieved December 1, 2020.
  4. ^ a b "City Subways Add 3 Transfer Points". The New York Times. January 16, 1978. p. B2. ISSN 0362-4331.
  5. ^ "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  6. ^ a b c d e f g h i j k l m n o p Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  7. ^ a b c d "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Retrieved November 19, 2019.
  8. ^ a b Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  9. ^ "Tunnel Contractor's Struggle With City Quicksands; Latest Difficulty Comes in the Last Stages of the Excavation in the Old Canal Street Swamp". The New York Times. October 5, 1902. ISSN 0362-4331. Retrieved January 6, 2021.
  10. ^ a b c Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283). Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.{{cite web}}: CS1 maint: postscript (link)
  11. ^ "First of Subway Tests; West Side Experimental Trains to be Run by Jan. 1 Broadway Tunnel Tracks Laid, Except on Three Little Sections, to 104th Street -- Power House Delays". The New York Times. November 14, 1903. ISSN 0362-4331. Retrieved May 10, 2022.
  12. ^ a b "Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train". The New York Times. October 28, 1904. p. 1. ISSN 0362-4331. Retrieved April 21, 2020.
  13. ^ "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now". The New York Times. August 2, 1908. p. 10. Retrieved November 6, 2016.
  14. ^ Herries, William (1916). Brooklyn Daily Eagle Almanac. The Brooklyn Daily Eagle. p. 119.
  15. ^ a b Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.{{cite web}}: CS1 maint: postscript (link)
  16. ^ a b Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911.
  17. ^ "Subway Loop Approved; Will Have Four Tracks". The New York Times. January 26, 1907. p. 16. ISSN 0362-4331. Retrieved August 1, 2019.
  18. ^ Stevenson, Frederick Boyd (July 13, 1913). "Colonel Williams' View of Centre Street Loop". The Brooklyn Daily Eagle. p. 23. Retrieved October 2, 2018.
  19. ^ "A New Subway Line for New York City". Engineering News. 63 (10). March 10, 1910.
  20. ^ http://www.columbia.edu/~brennan/abandoned/Canal.platf.jpg From the Abandoned Stations website: A Public Service Commission photo from 1909 shows the east platform with non-tiled steel columns. The view is looking south, showing the wall between the center tracks. The stepped structure at the base of wall near the image center is part of the bridge over the projected Canal St subway, not even begun at the time. The station looks completed, about four years before it opened. There is a rough strip near the platform edge. Track was to be installed by the operating company.
  21. ^ a b "Passenger Killed On Loop's First Day ; Printer, Impatient at Delay in New Bridge Subway, Tries to Walk the Track". The New York Times. August 5, 1913. p. 2. ISSN 0362-4331. Retrieved August 1, 2019.
  22. ^ "Broadway Subway Opened To Coney By Special Train. Brooklynites Try New Manhattan Link From Canal St. to Union Square. Go Via Fourth Ave. Tube". The Brooklyn Daily Eagle. September 4, 1917. Retrieved May 31, 2019.
  23. ^ "Open New Subway To Times Square; Brooklyn Directly Connected with Wholesale and Shopping Districts of New York. Nickel Zone Is Extended. First Train in Broadway Tube Makes Run from Rector Street in 17 Minutes. Cost About $20,000,000 Rapid Transit from Downtown to Hotel and Theatre Sections Expected to Affect Surface Lines. Increases Five-Cent Zone. First Trip to Times Square. Benefits to Brooklyn" (PDF). The New York Times. January 6, 1918. ISSN 0362-4331. Retrieved November 5, 2016.
  24. ^ "Open New Subway Lines to Traffic; Called a Triumph — Great H System Put in Operation Marks an Era in Railroad Construction — No Hitch in the Plans — But Public Gropes Blindly to Find the Way in Maze of New Stations — Thousands Go Astray — Leaders in City's Life Hail Accomplishment of Great Task at Meeting at the Astor" (PDF). The New York Times. August 2, 1918. p. 1. Archived (PDF) from the original on February 21, 2021. Retrieved November 6, 2016.
  25. ^ "33d Street to Be I.R.T. Express Stop; Reconstruction One of Many Station Improvements Ordered by Commission". The New York Times. December 17, 1922. ISSN 0362-4331. Retrieved June 21, 2022.
  26. ^ "$4,000,000 in Construction on I. R. T. Ordered: 33d St. on East Side Subway Will Be Express Stop; Local Stations to Have 10-Car Train Capacity Aim to Speed Service Improvements Will Relieve Congestion Along Both Routes. Board Believes". New-York Tribune. December 18, 1922. p. 22. ProQuest 573974563.
  27. ^ "Express Stop Plan Opposed by I.R.T.; Officials Say Money Is Not Available for Change at 33d Street Station". The New York Times. September 7, 1923. ISSN 0362-4331. Retrieved June 21, 2022.
  28. ^ "I. R. T. Wins Delay At Subway Platform Extension Hearing: Transit Commission Head Tells Meeting Widening West Side Stations Would Increase Capacity 25 P. C". New-York Tribune. September 7, 1923. p. 6. ProQuest 1237290874.
  29. ^ "B.M.T. Lines Pass to City Ownership; $175,000,000 Deal Completed at City Hall Ceremony-- Mayor 'Motorman No. 1'". The New York Times. June 2, 1940. ISSN 0362-4331. Archived from the original on July 19, 2021. Retrieved May 14, 2022.
  30. ^ "City Takes Over B. M. T. System; Mayor Skippers Midnight Train". New York Herald Tribune. June 2, 1940. p. 1. ProQuest 1243059209.
  31. ^ "City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign". The New York Times. June 13, 1940. ISSN 0362-4331. Archived from the original on January 7, 2022. Retrieved May 14, 2022.
  32. ^ "Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune. June 13, 1940. p. 25. ProQuest 1248134780.
  33. ^ a b Annual Report For The Year Ending June 30, 1959 (PDF). New York City Transit Authority. 1959. p. 9.
  34. ^ "4 IRT Stops To Open Longer Platforms". The New York Times. February 18, 1962. ISSN 0362-4331. Retrieved January 4, 2021.
  35. ^ Hevesi, Dennis (December 28, 1990). "Hazards Halt Manhattan Bridge Subway Line". The New York Times. ISSN 0362-4331. Retrieved March 18, 2010.
  36. ^ Sims, Calvin (January 8, 1991). "New York Reopened Bridge Subway Line In Spite of Warnings". The New York Times. ISSN 0362-4331. Retrieved March 18, 2010.
  37. ^ "Canal Street Canal, Alexander Brodsky (1997)". nycsubway.org. Retrieved May 18, 2010.
  38. ^ "Canal Street Neighborhood Map". mta.info. Metropolitan Transportation Authority. April 2018. Retrieved January 7, 2021.
  39. ^ "The abandoned Canal Street J/M/Z platform". November 3, 2015.
  40. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  41. ^ a b "6 Subway Timetable, Effective December 19, 2021". Metropolitan Transportation Authority. Retrieved February 3, 2022.
  42. ^ "4 Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved February 6, 2023.
  43. ^ a b c Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  44. ^ a b c d e f g h i Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412). Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.{{cite web}}: CS1 maint: postscript (link)
  45. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  46. ^ "J/Z Subway Timetable, Effective September 19, 2022". Metropolitan Transportation Authority. Retrieved February 6, 2023.
  47. ^ http://www.columbia.edu/~brennan/abandoned/Canal.openoldside.jpg
  48. ^ http://www.columbia.edu/~brennan/abandoned/Canal.junction.jpg From the Abandoned Stations website: "Another Public Service Commission image shows the tunnel just south of the station as it was in 1909. Here, as in the plan, the trackways curving in from the Manhattan Bridge line, right, just run into the main line on the level. At left is the track opening into the east track of Canal St station. This arrangement was rebuilt in 1913-1914, shifting the track to Canal St station a little farther back, so that when the Manhattan Bridge trains began running in 1915, they reached the east side of Chambers St without crossing the tracks of the Williamsburg Bridge trains".
  49. ^ a b "Of Dust and Tails: An abandoned subway tunnel from a forgotten era". August 2017.
  50. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  51. ^ "Open New Subway to Times Square". The New York Times. January 6, 1918. ISSN 0362-4331. Retrieved April 21, 2020.
  52. ^ "R Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
  53. ^ a b "N Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
  54. ^ "W Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
  55. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  56. ^ "Open First Section of Broadway Line". The New York Times. September 5, 1917. ISSN 0362-4331. Retrieved April 21, 2020.
  57. ^ "Q Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
Further reading
  • Stookey, Lee (1994). Subway ceramics : a history and iconography of mosaic and bas relief signs and plaques in the New York City subway system. Brattleboro, Vt: L. Stookey. ISBN 978-0-9635486-1-0. OCLC 31901471.
External links

nycsubway.org:

Google Maps Street View:

Other:

The content of this page is based on the Wikipedia article written by contributors..
The text is available under the Creative Commons Attribution-ShareAlike Licence & the media files are available under their respective licenses; additional terms may apply.
By using this site, you agree to the Terms of Use & Privacy Policy.
Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization & is not affiliated to WikiZ.com.