Get Our Extension

Ashburn station (Washington Metro)

From Wikipedia, in a visual modern way
Ashburn
WMATA Silver.svg
Ashburn Station Platform 1115.jpg
The station's platform on opening day
General information
Coordinates39°00′17″N 77°29′27″W / 39.0046°N 77.4909°W / 39.0046; -77.4909Coordinates: 39°00′17″N 77°29′27″W / 39.0046°N 77.4909°W / 39.0046; -77.4909
Platforms1 island platform
Tracks2
ConnectionsBus transport Loudoun County Transit: 331, 332, 341, 342, 343, 344, 351, 371, 372, 373, 374, 375, 391
Construction
Parking3,300 spaces
Bicycle facilities51 bicycle racks, 5 lockers
Disabled accessYes
Other information
Station codeN12
History
OpenedNovember 15, 2022
Passengers
2022122 daily[1]
Rank93rd
Services
Preceding station WMATA Metro Logo.svg Washington Metro Following station
Terminus Silver Line Loudoun Gateway
Location

Ashburn station is a Washington Metro station in Loudoun County, Virginia, United States, that serves as the Silver Line's western terminus.[2] Originally planned to begin operation in 2018,[3] the station opened on November 15, 2022.

Ashburn station is located at the median of the Dulles Greenway (SR 267) east of Old Ryan Road (SR 772). It is the farthest station from the Washington city center.[2] The station has two pedestrian bridges leading to either side of the Dulles Greenway, with bus bays and kiss and ride lots on both sides, as well as 1,650 parking spaces on each side. There are bicycle racks for both sides of the highway and five bike lockers for the north entrance.

Discover more about Ashburn station (Washington Metro) related topics

Washington Metro

Washington Metro

The Washington Metro, often abbreviated as the Metro and formally the Metrorail, is a rapid transit system serving the Washington metropolitan area of the United States. It is administered by the Washington Metropolitan Area Transit Authority (WMATA), which also operates the Metrobus service under the Metro name. Opened in 1976, the network now includes six lines, 97 stations, and 129 miles (208 km) of route.

Loudoun County, Virginia

Loudoun County, Virginia

Loudoun County is in the northern part of the Commonwealth of Virginia in the United States. In 2020, the census returned a population of 420,959, making it Virginia's third-most populous county. Loudoun County's seat is Leesburg. Loudoun County is part of the Washington–Arlington–Alexandria, DC–VA–MD–WV Metropolitan Statistical Area. As of 2020, Loudoun County had a median household income of $147,111. Since 2008, the county has been ranked first in the U.S. in median household income among jurisdictions with a population of 65,000 or more.

Virginia

Virginia

Virginia, officially the Commonwealth of Virginia, is a state in the Mid-Atlantic and Southeastern regions of the United States between the Atlantic Coast and the Appalachian Mountains. Its geography and climate are shaped by the Blue Ridge Mountains and the Chesapeake Bay. The state's capital is Richmond. Its most-populous city is Virginia Beach, and Fairfax County is the state's most-populous political subdivision. Virginia's population in 2022 was over 8.68 million, with 35% living within in the Greater Washington metropolitan area.

United States

United States

The United States of America, commonly known as the United States or America, is a country primarily located in North America. It consists of 50 states, a federal district, five major unincorporated territories, nine Minor Outlying Islands, and 326 Indian reservations. The United States is also in free association with three Pacific Island sovereign states: the Federated States of Micronesia, the Marshall Islands, and the Republic of Palau. It is the world's third-largest country by both land and total area. It shares land borders with Canada to its north and with Mexico to its south and has maritime borders with the Bahamas, Cuba, Russia, and other nations. With a population of over 333 million, it is the most populous country in the Americas and the third most populous in the world. The national capital of the United States is Washington, D.C. and its most populous city and principal financial center is New York City.

Silver Line (Washington Metro)

Silver Line (Washington Metro)

The Silver Line is a rapid transit line of the Washington Metro system, consisting of 34 stations in Loudoun County, Fairfax County and Arlington County, Virginia, Washington, D.C., as well as Prince George's County, Maryland. The Silver Line runs from Ashburn in Virginia to Downtown Largo in Maryland. Five stations, from both lines' eastern terminus at Downtown Largo to Benning Road, are shared with the Blue Line alone; thirteen stations, from Stadium–Armory to Rosslyn, with both the Orange Line and Blue Lines; and five stations from Court House to East Falls Church with the Orange Line alone. Only the five stations of Phase 1, which began service on July 26, 2014, and the six stations of Phase 2, which began service on November 15, 2022, are exclusive to the Silver Line.

Virginia State Route 267

Virginia State Route 267

State Route 267 is a primary state highway in the US state of Virginia. It consists of two end-to-end toll roads – the Dulles Toll Road and Dulles Greenway – as well as the non-tolled Dulles Access Road, which lies in the median of Dulles Toll Road and then extends east to Falls Church. The combined roadway provides a toll road for commuting and a free road for access to Washington Dulles International Airport. The three sections are operated and maintained by separate agencies: Dulles Toll Road and Dulles Access Road are maintained by the Metropolitan Washington Airports Authority (MWAA); the Dulles Greenway is owned by TRIP II, a limited partnership, but is maintained by Atlas Arteria, an Australian company which owns the majority stake in the partnership. The Dulles Access Road's median hosts the Silver Line of the Washington Metro between the airport and Tysons.

History

The station under construction in 2019
The station under construction in 2019

The Silver Line was developed in the 21st century to link Washington, D.C., by rail to Washington Dulles International Airport and the edge cities of Tysons, Reston, Herndon, and Ashburn.[4] It was built in two phases; the first phase, linking Washington, D.C., to Wiehle–Reston East, opened in 2014.[5] The funding and planning of Phase 2 through Dulles Airport continued while Phase 1 was being constructed. In 2012, the Loudoun County Board of Supervisors voted 5 to 4 to extend the line to Dulles Airport and into the county.[6] On April 25, 2013, the Phase 2 contract was issued at a cost of $1.177 billion.[7]

In April 2015, project officials pushed back the opening date for the station to late 2019, stating that stricter requirements for stormwater management caused much of the delay. Per officials, the line also had to incorporate improvements to the system's automated train controls that were a late addition to the project's first phase.[8] Around the same time as this announcement, the Washington Metropolitan Area Transit Authority (WMATA) approved the Loudoun County Board of Supervisors' name for the stop.[9] In August 2019, project officials reported that they expected construction on the second phase of the Silver Line to be completed by mid-2020.[10] The opening date was postponed to early 2021,[11] then to late 2021.[12] In February 2021, Metro announced that it would need five months to test the Phase 2 extension.[13][14] The Metropolitan Washington Airports Authority (MWAA) then announced that the Phase 2 extension should be substantially complete by Labor Day 2021,[15] although MWAA subsequently missed this deadline.[16]

MWAA declared the work on the rail line to be "substantially complete" in November 2021. However, WMATA estimated that it could take five months of testing and other preparations before passenger service could begin.[17] Simulated service testing began operating along the Phase 2 tracks in October 2022.[18][19][20] Phase 2 was formally opened on November 15, 2022.[21]

Discover more about History related topics

Washington, D.C.

Washington, D.C.

Washington, D.C., formally the District of Columbia and commonly known as Washington or D.C., is the capital city and federal district of the United States. The city is located on the east bank of the Potomac River, which forms its southwestern border with Virginia, and borders Maryland to its north and east. The city was named for George Washington, a Founding Father, commanding general of the Continental Army in the American Revolutionary War, and the first president of the United States, and the district is named for Columbia, the female personification of the nation.

Edge city

Edge city

Edge city is a term that originated in the United States for a concentration of business, shopping, and entertainment outside a traditional downtown or central business district, in what had previously been a suburban residential or rural area. The term was popularized by the 1991 book Edge City: Life on the New Frontier by Joel Garreau, who established its current meaning while working as a reporter for The Washington Post. Garreau argues that the edge city has become the standard form of urban growth worldwide, representing a 20th-century urban form unlike that of the 19th-century central downtown. Other terms for these areas include suburban activity centers, megacenters, and suburban business districts. These districts have now developed in many countries.

Tysons, Virginia

Tysons, Virginia

Tysons, also known as Tysons Corner, is a census-designated place (CDP) in Fairfax County, Virginia, United States, developed from the corner of Chain Bridge Road and the Leesburg Pike. Located in Northern Virginia between the community of McLean and the town of Vienna along the Capital Beltway (I-495), it is in the Washington metropolitan area. Tysons is home to two super-regional shopping malls—Tysons Corner Center and Tysons Galleria—and the corporate and administrative headquarters of numerous companies, such as Intelsat, Alarm.com, Booz Allen Hamilton, Capital One, DXC Technology, Freddie Mac, Gannett, Hilton Worldwide, ID.me and Tegna. As an unincorporated community, Tysons is Fairfax County's central business district and a regional commercial center. It has been called a quintessential example of an edge city. The population was 26,374 as of the 2020 census.

Reston, Virginia

Reston, Virginia

Reston is a census-designated place in Fairfax County, Virginia, and a principal city of the Washington metropolitan area. As of the 2020 U.S. Census, Reston's population was 63,226.

Herndon, Virginia

Herndon, Virginia

Herndon is a town in Fairfax County, Virginia, in the Washington, D.C. metropolitan area of the United States. The population was 23,292 at the 2010 census. In 2020, the population was estimated to be 24,532, which makes it the largest of three incorporated towns in the county.

Ashburn, Virginia

Ashburn, Virginia

Ashburn is a census-designated place (CDP) in Loudoun County, Virginia, United States. At the 2010 United States Census, its population was 43,511, up from 3,393 twenty years earlier. It is 30 miles (48 km) northwest of Washington, D.C., and part of the Washington metropolitan area.

Wiehle–Reston East station

Wiehle–Reston East station

Wiehle–Reston East is a Washington Metro station in Fairfax County, Virginia on the Silver Line. Located in Reston, the station is situated alongside Reston Station, a mixed-use urban center. Upon its opening, Wiehle–Reston East was the western terminus of the Silver Line until November 15, 2022, when service was extended to the new westernmost terminus at Ashburn station.

Loudoun County Board of Supervisors

Loudoun County Board of Supervisors

Loudoun County, Virginia is divided into eight magisterial districts: Algonkian, Ashburn, Blue Ridge, Broad Run, Catoctin, Dulles, Leesburg, and Sterling. The magisterial districts each elect one supervisor to the Board of Supervisors which governs Loudoun County. There is also a Chair elected by the county at-large, bringing total Board membership to nine. A Vice-Chair is selected by the Board from among its membership. The current Chair is Phyllis Randall. The current Vice-Chair is Koran Saines, the Sterling District Supervisor. He has served as Vice-Chair since January 2020. Board members serve four-year terms. Salaries for the current Board term of 2020-2023 were set by the previous Board in July 2017.

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority

The Washington Metropolitan Area Transit Authority, commonly referred to as Metro, is a tri-jurisdictional government agency that operates transit service in the Washington metropolitan area. WMATA was created by the United States Congress as an interstate compact between the District of Columbia, Maryland, and Virginia.

Metropolitan Washington Airports Authority

Metropolitan Washington Airports Authority

The Metropolitan Washington Airports Authority (MWAA) is an independent airport authority, created with the consent of the United States Congress to oversee management, operations, and capital development of the two major airports serving the U.S. national capital: Ronald Reagan Washington National Airport and Dulles International Airport.

Station layout

M Mezzanine Fare control, ticket machines, station agent
P
Platform level
Eastbound WMATA Silver.svg toward Downtown Largo (Loudoun Gateway)
WMATA Silver.svg termination track
Island platform
Eastbound WMATA Silver.svg toward Downtown Largo (Loudoun Gateway)
WMATA Silver.svg termination track
G Street level Exit/entrance, buses, parking

Discover more about Station layout related topics

Silver Line (Washington Metro)

Silver Line (Washington Metro)

The Silver Line is a rapid transit line of the Washington Metro system, consisting of 34 stations in Loudoun County, Fairfax County and Arlington County, Virginia, Washington, D.C., as well as Prince George's County, Maryland. The Silver Line runs from Ashburn in Virginia to Downtown Largo in Maryland. Five stations, from both lines' eastern terminus at Downtown Largo to Benning Road, are shared with the Blue Line alone; thirteen stations, from Stadium–Armory to Rosslyn, with both the Orange Line and Blue Lines; and five stations from Court House to East Falls Church with the Orange Line alone. Only the five stations of Phase 1, which began service on July 26, 2014, and the six stations of Phase 2, which began service on November 15, 2022, are exclusive to the Silver Line.

Downtown Largo station

Downtown Largo station

Downtown Largo is an island-platformed Washington Metro station in Lake Arbor census-designated place, unincorporated Prince George's County, Maryland, United States, with a Largo postal address.

Loudoun Gateway station

Loudoun Gateway station

Loudoun Gateway station is a Washington Metro station in Loudoun County, Virginia, on the Silver Line. It is located at SR 606 and the ramps to SR 267. Originally planned to begin operations in 2018, the station opened on November 15, 2022.

Island platform

Island platform

An island platform is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway interchange. Island platforms are popular on twin-track routes due to pragmatic and cost reasons. They are also useful within larger stations where local and express services for the same direction of travel can be provided from opposite sides of the same platform thereby simplifying transfers between the two tracks. An alternative arrangement is to position side platforms on either side of the tracks. The historical use of island platforms depends greatly upon the location. In the United Kingdom the use of island platforms is relatively common when the railway line is in a cutting or raised on an embankment, as this makes it easier to provide access to the platform without walking across the tracks.

Source: "Ashburn station (Washington Metro)", Wikipedia, Wikimedia Foundation, (2023, February 17th), https://en.wikipedia.org/wiki/Ashburn_station_(Washington_Metro).

Enjoying Wikiz?

Enjoying Wikiz?

Get our FREE extension now!

References
  1. ^ "Rail Ridership Data Viewer". WMATA. Retrieved February 17, 2023.
  2. ^ a b "Ashburn". dullesmetro.com. Retrieved June 11, 2016.
  3. ^ "Second Phase Of Silver Line Delayed By At Least 13 Months". April 27, 2015. Retrieved April 27, 2015.
  4. ^ "Silver Line Activation Plan" (PDF). WMATA. Archived from the original (PDF) on February 9, 2014. Retrieved June 28, 2014.
  5. ^ III, Ashley Halsey; Aratani, Lori; Duggan, Paul (July 26, 2014). "All aboard! Metro's new Silver Line rolls down the tracks for the first time". Washington Post. ISSN 0190-8286. Retrieved November 16, 2022.
  6. ^ Jacobson Moore, Erika (July 3, 2012). "Loudoun's In: Split Board Backs Silver Line Extension". Leesburg Today Media Services. Archived from the original on July 8, 2012. Retrieved July 9, 2012.
  7. ^ "Airports Authority Intends to Award Phase 2 Construction Contract to Capital Rail Constructors" (Press release). April 25, 2013. Retrieved March 22, 2014.
  8. ^ Goldberg, The Associated Press, Jeff (April 28, 2015). "Final phase of Silver Line to Dulles delayed until 2019". WJLA. Retrieved December 13, 2020.
  9. ^ "Loudoun Silver Line station names finalized with Metro board approval". Loudoun Times-Mirror. April 27, 2015. Retrieved April 27, 2015.
  10. ^ Roussey/ABC7, Tom (August 6, 2019). "Airports Authority: Silver Line could be completed by April 2020". WJLA. Retrieved December 13, 2020.
  11. ^ Roussey (ABC7), Tom (February 20, 2020). "Second phase of Metro Silver Line delayed again, will open spring 2021 at the earliest". WJLA. Retrieved December 13, 2020.
  12. ^ "Second phase of Metro's Silver Line now expected to be delayed again, to fall 2021". wjla.com. Retrieved December 13, 2020.
  13. ^ "Silver Line Phase 2 Update" (PDF). WMATA. February 11, 2021. Retrieved September 6, 2021.
  14. ^ Cushman & Wakefield Research (February 3, 2014). "Silver Line". Washington Business Journal. Retrieved September 6, 2021.
  15. ^ "Silver Line extension expected to be ready for Metro takeover by Labor Day". March 5, 2021.
  16. ^ "MWAA will miss Labor Day deadline for Silver Line Phase 2, likely pushing back opening". July 2, 2021.
  17. ^ "Silver Line extension to Dulles inches closer to completion after years of delay". Washington Post. ISSN 0190-8286. Retrieved November 16, 2022.
  18. ^ "Simulated service for Silver Line Phase Two to begin next month but opening date uncertain". FFXnow. September 8, 2022. Retrieved October 7, 2022.
  19. ^ "Your new Silver Line stations coming soon with a new Metrorail map". www.wmata.com. WMATA. Retrieved October 7, 2022.
  20. ^ "Next Phase of Silver Line to Open Soon". NBC4 Washington. Retrieved October 7, 2022.
  21. ^ "Metro launches Silver Line Extension with opening ceremony; welcomes customers to #RideSilver to six new stations" (Press release). Washington Metropolitan Area Transit Authority. November 15, 2022.

The content of this page is based on the Wikipedia article written by contributors..
The text is available under the Creative Commons Attribution-ShareAlike Licence & the media files are available under their respective licenses; additional terms may apply.
By using this site, you agree to the Terms of Use & Privacy Policy.
Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization & is not affiliated to WikiZ.com.