Get Our Extension

7 Subway Extension

From Wikipedia, in a visual modern way
7 Subway Extension
"7" train "7" express train
The 7 and 7 Express (designated as on rolling stock) services serve the entire 7 Subway Extension.
Overview
OwnerCity of New York
Termini
Stations1 constructed
(1 proposed)
Service
TypeRapid transit
SystemNew York City Subway
Operator(s)New York City Transit Authority
History
OpenedSeptember 13, 2015; 7 years ago (2015-09-13)
Technical
Line length1.5 mi (2.4 km)
Number of tracks2
CharacterUnderground
Track gauge4 ft 8+12 in (1,435 mm)
Electrification625 V DC third rail

The 7 Subway Extension is a subway extension of the New York City Subway's IRT Flushing Line, which is served by the 7 local and express services. The extension stretches 1.5 miles (2.4 km) southwest from its previous terminus at Times Square, at Seventh Avenue and 41st Street, to one new station at 34th Street and Eleventh Avenue. A second station at 10th Avenue and 41st Street was dropped from the plans in October 2007. The entirety of the extension is located within the New York City borough of Manhattan. The extension, a key part of the Hudson Yards Redevelopment Project, is expected to bring business and entertainment into the area, as well as aid redevelopment of nearby Chelsea and Hell's Kitchen, located around the Long Island Rail Road's West Side Yard. The extension also serves the nearby Jacob K. Javits Convention Center.

The project was originally proposed in 2005 as part of the Hudson Yards project, which included the failed attempt to build the West Side Stadium for the New York Jets and the city's bid for the 2012 Summer Olympics. Although the stadium plan was rejected by the state legislature, the rest of the Hudson Yards rail yard development, including the 7 Subway Extension, went forward. Construction on the extension started in 2007.

The extension's opening was postponed multiple times from its original target of December 2013. The delays were attributed to a variety of problems, mostly involving the 170-foot-long (52 m) incline elevators that were custom-designed for the new station. The extension finally opened to the public on September 13, 2015.

Discover more about 7 Subway Extension related topics

Rapid transit

Rapid transit

Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be called a subway, tube, or underground. Unlike buses or trams, rapid transit systems are railways, usually electric, that operate on an exclusive right-of-way, which cannot be accessed by pedestrians or other vehicles. They are often grade-separated in tunnels or on elevated railways.

New York City Subway

New York City Subway

The New York City Subway is a rapid transit system in the New York City boroughs of Manhattan, Brooklyn, Queens, and the Bronx. It is owned by the government of New York City and leased to the New York City Transit Authority, an affiliate agency of the state-run Metropolitan Transportation Authority (MTA). Opened on October 27, 1904, the New York City Subway is one of the world's oldest public transit systems, one of the most-used, and the one with the most stations, with 472 stations in operation.

IRT Flushing Line

IRT Flushing Line

The IRT Flushing Line is a rapid transit route of the New York City Subway system, named for its eastern terminal in Flushing, Queens. It is operated as part of the A Division. The Interborough Rapid Transit Company (IRT), a private operator, had constructed the section of the line from Flushing, Queens, to Times Square, Manhattan between 1915 and 1928. A western extension was opened to Hudson Yards in western Manhattan in 2015, and the line now stretches from Flushing to Chelsea, Manhattan. It carries trains of the 7 local service, as well as the express <7> during rush hours in the peak direction. It is the only currently operational IRT line to serve Queens.

7 (New York City Subway service)

7 (New York City Subway service)

The 7 Flushing Local and <7> Flushing Express are two rapid transit services in the A Division of the New York City Subway, providing local and express services along the full length of the IRT Flushing Line. Their route emblems, or "bullets", are colored purple, since they serve the Flushing Line.

New York City

New York City

New York, often called New York City or NYC, is the most populous city in the United States. With a 2020 population of 8,804,190 distributed over 300.46 square miles (778.2 km2), New York City is the most densely populated major city in the United States and more than twice as populous as Los Angeles, the nation's second-largest city. New York City is located at the southern tip of New York State. It constitutes the geographical and demographic center of both the Northeast megalopolis and the New York metropolitan area, the largest metropolitan area in the U.S. by both population and urban area. With over 20.1 million people in its metropolitan statistical area and 23.5 million in its combined statistical area as of 2020, New York is one of the world's most populous megacities, and over 58 million people live within 250 mi (400 km) of the city. New York City is a global cultural, financial, entertainment, and media center with a significant influence on commerce, health care and life sciences, research, technology, education, politics, tourism, dining, art, fashion, and sports. Home to the headquarters of the United Nations, New York is an important center for international diplomacy, and is sometimes described as the capital of the world.

Manhattan

Manhattan

Manhattan is the most densely populated and geographically smallest of the five boroughs of New York City. The borough is also coextensive with New York County, one of the original counties of the U.S. state of New York. Located near the southern tip of New York State, Manhattan is based in the Eastern Time Zone and constitutes both the geographical and demographic center of the Northeast megalopolis and the urban core of the New York metropolitan area, the largest metropolitan area in the world by urban landmass. Over 58 million people live within 250 miles of Manhattan, which serves as New York City’s economic and administrative center, cultural identifier, and the city’s historical birthplace. Residents of the outer boroughs of New York City often refer to Manhattan as "the city". Manhattan has been described as the cultural, financial, media, and entertainment capital of the world, and hosts the United Nations headquarters. Manhattan also serves as the headquarters of the global art market, with numerous art galleries and auction houses collectively hosting half of the world’s art auctions.

Chelsea, Manhattan

Chelsea, Manhattan

Chelsea is a neighborhood on the West Side of the borough of Manhattan in New York City. The area's boundaries are roughly 14th Street to the south, the Hudson River and West Street to the west, and Sixth Avenue to the east, with its northern boundary variously described as near the upper 20s or 34th Street, the next major crosstown street to the north. To the northwest of Chelsea is the neighborhood of Hell's Kitchen, as well as Hudson Yards; to the northeast are the Garment District and the remainder of Midtown South; to the east are NoMad and the Flatiron District; to the southwest is the Meatpacking District; and to the south and southeast are the West Village and the remainder of Greenwich Village. Chelsea is named after the Royal Hospital Chelsea in London, England.

Hell's Kitchen, Manhattan

Hell's Kitchen, Manhattan

Hell's Kitchen, also known as Clinton, is a neighborhood on the West Side of Midtown Manhattan in New York City. It is considered to be bordered by 34th Street to the south, 59th Street to the north, Eighth Avenue to the east, and the Hudson River to the west.

Long Island Rail Road

Long Island Rail Road

The Long Island Rail Road, often abbreviated as the LIRR, is a commuter rail system in the southeastern part of the U.S. state of New York, stretching from Manhattan to the eastern tip of Suffolk County on Long Island. With an average weekday ridership of 354,800 passengers in 2016, it is the busiest commuter railroad in North America. It is also one of the world's few commuter systems that runs 24/7 year-round. It is publicly owned by the Metropolitan Transportation Authority, which refers to it as MTA Long Island Rail Road. In 2021, the system had a ridership of 49,167,600, or about 226,100 per weekday as of the third quarter of 2022.

New York Jets

New York Jets

The New York Jets are a professional American football team based in the New York metropolitan area. The Jets compete in the National Football League (NFL) as a member club of the league's American Football Conference (AFC) East division. The Jets play their home games at MetLife Stadium in East Rutherford, New Jersey, 5 miles (8.0 km) west of New York City. The team is headquartered in Florham Park, New Jersey. The franchise is legally organized as a limited liability company under the name New York Jets, LLC.

2012 Summer Olympics

2012 Summer Olympics

The 2012 Summer Olympics was an international multi-sport event held from 27 July to 12 August 2012 in London, England, United Kingdom. The first event, the group stage in women's football, began on 25 July at the Millennium Stadium in Cardiff, Wales, followed by the opening ceremony on 27 July. There were 10,768 athletes from 204 National Olympic Committees (NOCs) who participated in the 2012 Olympics.

Hudson Yards (development)

Hudson Yards (development)

Hudson Yards is a 28-acre (11 ha) real estate development in the area of the same name in Manhattan, New York City, between the Chelsea and Hell's Kitchen neighborhoods. It is located on the waterfront of the Hudson River. Upon completion, 13 of the 16 planned structures on the West Side of Midtown South would sit on a platform built over the West Side Yard, a storage yard for Long Island Rail Road trains. The first of its two phases, opened in 2019, comprises a public green space and eight structures that contain residences, a hotel, office buildings, a mall, and a cultural facility. The second phase, on which construction had not started as of 2022, will include residential space, an office building, and a school.

Historical context

Map of the Manhattan portion of the Flushing Line, and nearby subway lines. The unbuilt 10th Avenue station is shown. The solid purple segment represents the pre-existing portion of the Flushing Line, while the dashed purple segment represents the new portion of the Flushing Line, and the dashed blue segment represents storage tracks south of 34th Street–Hudson Yards.
Map of the Manhattan portion of the Flushing Line, and nearby subway lines. The unbuilt 10th Avenue station is shown. The solid purple segment represents the pre-existing portion of the Flushing Line, while the dashed purple segment represents the new portion of the Flushing Line, and the dashed blue segment represents storage tracks south of 34th Street–Hudson Yards.

Proposals to extend the transit system to the Far West Side to support massive redevelopment were floated as early as 1969, when the New York City Planning Commission's (CPC's) master plan proposed to expand midtown westward along a 48th Street transit line to replace what the plan described as "blocks of antiquated and deteriorating structures of every sort" between Eighth and Twelfth avenues.[1] That proposal for the West 40s and 50s failed after voters rejected a state bond issue that would have financed the proposed new east–west transit line or "people mover."[2] Subsequently, attention shifted to the West 30s and the IRT Flushing Line.

In response to the CPC's 1993 proposal to improve access to the Manhattan Central Business District,[3] the Metropolitan Transportation Authority (MTA) began exploring the possibility of a 7 extension to New Jersey.[4] In 2001, a business and civic group convened by Senator Charles Schumer argued that a westward extension of the Midtown office district could not be accomplished without a subway extension, saying:[5]

The long blocks along the avenues make the walk as long as 20 minutes to the westernmost parts of the area. In addition, there is no convenient link from Grand Central Station or elsewhere on the east side of Manhattan, making the Far West Side a difficult commute for workers from parts of Manhattan, Queens, Westchester and Connecticut.[5]

An extension of the Flushing Line was then proposed as part of the New York City bid for the 2012 Summer Olympics.[6][7] The City wanted to get funding before July 2005, at which time the International Olympic Committee would vote on funding. However, due to shortfalls in the MTA's Capital Program, as well as preexisting funding for the Second Avenue Subway and East Side Access, the MTA could not pay to fund the extension.[4] After a proposal for the West Side Stadium, an Olympic stadium to be located above the nearby West Side Yard, was rejected in 2005,[8] New York City quickly lost their Olympic bid.[9] However, in a report entitled No. 7 Subway Extension – Hudson Yards Rezoning and Development Program, the government of New York City, devised a rezoning plan for the Hudson Yards area and proposed two new subway stations to serve that area.[10] The subway extension was approved[4] following the successful rezoning of about 60 blocks from 28th to 43rd Streets, which became the Hudson Yards neighborhood.[11]

Mayor Michael Bloomberg's December 12, 2006, address to the New York League of Conservation Voters noted that in November 2006, the government began issuing bonds to fund the extension of the 7 subway to Eleventh Avenue and 34th Street.[12] The $2.4 billion extension was funded with New York City funds from municipal Tax Increment Financing (TIF) bond sales that are expected to be repaid with property tax revenues from future developments in areas served by the extension.[13]

Discover more about Historical context related topics

IRT Flushing Line

IRT Flushing Line

The IRT Flushing Line is a rapid transit route of the New York City Subway system, named for its eastern terminal in Flushing, Queens. It is operated as part of the A Division. The Interborough Rapid Transit Company (IRT), a private operator, had constructed the section of the line from Flushing, Queens, to Times Square, Manhattan between 1915 and 1928. A western extension was opened to Hudson Yards in western Manhattan in 2015, and the line now stretches from Flushing to Chelsea, Manhattan. It carries trains of the 7 local service, as well as the express <7> during rush hours in the peak direction. It is the only currently operational IRT line to serve Queens.

Metropolitan Transportation Authority

Metropolitan Transportation Authority

The Metropolitan Transportation Authority (MTA) is a public benefit corporation responsible for public transportation in the New York City metropolitan area of the U.S. state of New York. The MTA is the largest public transit authority in the United States, serving 12 counties in Downstate New York, along with two counties in southwestern Connecticut under contract to the Connecticut Department of Transportation, carrying over 11 million passengers on an average weekday systemwide, and over 850,000 vehicles on its seven toll bridges and two tunnels per weekday.

Grand Central Terminal

Grand Central Terminal

Grand Central Terminal is a commuter rail terminal located at 42nd Street and Park Avenue in Midtown Manhattan, New York City. Grand Central is the southern terminus of the Metro-North Railroad's Harlem, Hudson and New Haven Lines, serving the northern parts of the New York metropolitan area. It also contains a connection to the Long Island Rail Road through the Grand Central Madison station, a 16-acre (65,000 m2) rail terminal underneath the Metro-North station, built from 2007 to 2023. The terminal also connects to the New York City Subway at Grand Central–42nd Street station. The terminal is the third-busiest train station in North America, after New York Penn Station and Toronto Union Station.

Manhattan

Manhattan

Manhattan is the most densely populated and geographically smallest of the five boroughs of New York City. The borough is also coextensive with New York County, one of the original counties of the U.S. state of New York. Located near the southern tip of New York State, Manhattan is based in the Eastern Time Zone and constitutes both the geographical and demographic center of the Northeast megalopolis and the urban core of the New York metropolitan area, the largest metropolitan area in the world by urban landmass. Over 58 million people live within 250 miles of Manhattan, which serves as New York City’s economic and administrative center, cultural identifier, and the city’s historical birthplace. Residents of the outer boroughs of New York City often refer to Manhattan as "the city". Manhattan has been described as the cultural, financial, media, and entertainment capital of the world, and hosts the United Nations headquarters. Manhattan also serves as the headquarters of the global art market, with numerous art galleries and auction houses collectively hosting half of the world’s art auctions.

Queens

Queens

Queens is a borough of New York City, coextensive with Queens County, in the U.S. state of New York. Located on Long Island, it is the largest New York City borough by area. It is bordered by the borough of Brooklyn at the western tip of Long Island, and Nassau County to its east. Queens shares water borders with the boroughs of Manhattan, the Bronx, and Staten Island.

Connecticut

Connecticut

Connecticut is the southernmost state in the New England region of the Northeastern United States. As of the 2020 United States census, Connecticut was home to over 3.6 million residents, its highest decennial count count ever, growing every decade since 1790. The state is bordered by Rhode Island to its east, Massachusetts to its north, New York to its west, and Long Island Sound to its south. Its capital is Hartford, and its most populous city is Bridgeport. Historically, the state is part of New England as well as the tri-state area with New York and New Jersey. The state is named for the Connecticut River which approximately bisects the state. The word "Connecticut" is derived from various anglicized spellings of "Quinnetuket”, a Mohegan-Pequot word for "long tidal river".

New York City bid for the 2012 Summer Olympics

New York City bid for the 2012 Summer Olympics

The New York City 2012 Olympic bid was one of the five short-listed bids for the 2012 Summer Olympics, ultimately won by London.

International Olympic Committee

International Olympic Committee

The International Olympic Committee is a non-governmental sports organisation based in Lausanne, Switzerland. It is constituted in the form of an association under the Swiss Civil Code. Founded in 1894 by Pierre de Coubertin and Demetrios Vikelas, it is the authority responsible for organising the modern Olympic Games.

Second Avenue Subway

Second Avenue Subway

The Second Avenue Subway is a New York City Subway line that runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, with three new stations on Manhattan's Upper East Side, opened on January 1, 2017. The full Second Avenue Line, if and when it will be funded, will be built in three more phases to eventually connect Harlem–125th Street in Harlem to Hanover Square in Lower Manhattan. The proposed full line would be 8.5 miles (13.7 km) and 16 stations long, serve a projected 560,000 daily riders, and cost more than $17 billion.

East Side Access

East Side Access

East Side Access (ESA) is a public works project in New York City that extended the Long Island Rail Road (LIRR) two miles from its Main Line in Queens to a new station under Grand Central Terminal on Manhattan's East Side. The Metropolitan Transportation Authority (MTA) project was originally scheduled to open in 2009 but was delayed by more than a decade. The new station and tunnels opened with limited service to Jamaica station in Queens on January 25, 2023. Full service began on February 27. The estimated cost of the project rose nearly threefold from US$3.5 billion to US$11.1 billion as of April 2018, making it one of the world's most expensive underground rail-construction projects.

Government of New York City

Government of New York City

The government of New York City, headquartered at New York City Hall in Lower Manhattan, is organized under the New York City Charter and provides for a mayor-council system. The mayor is elected to a four-year term and is responsible for the administration of city government. The New York City Council is a unicameral body consisting of 51 members, each elected from a geographic district, normally for four-year terms. All elected officials—other than those elected before 2010, who are limited to three consecutive terms—are subject to a two consecutive-term limit. The court system consists of two citywide courts and three statewide courts.

Michael Bloomberg

Michael Bloomberg

Michael Rubens Bloomberg is an American businessman, politician, philanthropist, and author. He is the majority owner, co-founder and CEO of Bloomberg L.P. He was Mayor of New York City from 2002 to 2013, and was a candidate for the 2020 Democratic nomination for President of the United States. He has served as chair of the Defense Innovation Board, an independent advisory board that provides recommendations on artificial intelligence, software, data and digital modernization to the United States Department of Defense, since June 2022.

Construction progress

In October 2007, the Metropolitan Transportation Authority (MTA) awarded a $1.145 billion contract to build 7,000 feet (2,100 m) of twin-tube tunnel from the 7 train's then-terminus at Times Square to the then-planned shell of the 34th Street–Hudson Yards station. The contract was awarded to S3, a joint venture of J.F. Shea, Skanska USA Civil, and Schiavone.[14][15][16] The extension's construction was overseen by the MTA's Capital Construction division.[7] Dattner Architects, designed the 34th Street station.[17] After excavating the new terminal's shell and creating the first 1,000 feet (300 m) of tunnel using the drill-and-blast method, S3 placed two tunnel-boring machines (TBMs) in the ground to dig the remaining 6,000 feet (1,800 m); as it dug, each TBM placed precast concrete liner segments to create the tunnel interior.[17]

Early on in the project, it was announced that the new stations would feature platform screen doors.[18] The stations (along with the new South Ferry station on the IRT Broadway–Seventh Avenue Line and the three Phase 1 Second Avenue Subway stations in the Upper East Side) would include special air-cooling systems to reduce the temperature along platforms.[19] Due to its depth, the extension has ventilation towers, rather than the ventilation grates ubiquitous in the rest of the subway system.[20]

However, in October 2007, soon after the announcement of the new extension, the 10th Avenue station was canceled due to an overrun of the $2.4 billion budget,[14] and the MTA did not have an extra $500 million to build the 10th Avenue station.[21][22] On December 3, 2007, the MTA conducted a ceremony at the Times Square subway station marking the launch of construction of the 7 train extension. The contractor began excavating the station cavern adjacent to the Javits Convention Center.[23] One physical hindrance to the construction of the extension was the lower-level platform at 42nd Street–Port Authority Bus Terminal on the IND Eighth Avenue Line. The abandoned platform was partially razed to allow the 7 train extension to be built.[24] In order for the TBMs to meet up with the existing lay-up tracks west of Times Square, the Eighth Avenue Line had to be underpinned to support the existing line.[25]

Overview of subway construction area with arrows pointing to the entrances. (Left arrow points to main 34th Street entrance; right arrow, secondary 35th Street entrance.)
Overview of subway construction area with arrows pointing to the entrances. (Left arrow points to main 34th Street entrance; right arrow, secondary 35th Street entrance.)

In June 2008, construction on the tunnels began along Eleventh Avenue in Manhattan.[26] In February 2009, S3 lowered the first of two tunnel-boring machines into a giant shaft at the corner of 25th Street and Eleventh Avenue. The two boring machines dug parallel 7,100-foot (2,200 m) long tunnels north along Eleventh Avenue to the current terminus of the 7 service at 41st Street and Times Square.[27] The MTA posted a construction update with photographs on its website in November 2008, showing substantial progress.[28]

The MTA completed excavation of a 150-foot (46 m) long cavern in June 2009. The cavern was dug below the bus entrance ramp to the lower level of the Port Authority Bus Terminal and formed part of the eastern end of the new extension and connected it to the Times Square station. At the same time, tunnels were being dug northward from the machine shaft at 26th Street; soft ground at 27th and 28th Street required 300 feet (91 m) of ground to be frozen so that the tunnel-boring machines could easily dig through the soil.[29] On December 21, 2009, it was announced that a tunnel-boring machine broke through the 34th Street station cavern wall.[29][30] Both tunnel-boring machines were scheduled to finish the required tunneling in the spring of 2010.[31]

In June 2010, one of the TBMs completed its tunnel at the cavern.[32] The second TBM broke through the wall of the cavern on July 15, 2010, completing its tunneling operation.[33] The TBMs were partially disassembled and backed up to the 25th Street shaft, where they were lifted out.[32][33][34] In April 2011, the MTA announced that the contract covering the tunnels, the 34th Street station mezzanine and passenger platform was 85% complete, and that the systems contract, covering mechanical and electrical systems, electric power, lighting and train tracks would be awarded by July 2011. A second entrance to the station is planned.[35] In May 2012, the MTA announced that the extension, now 65% complete, had received the installation of the first set of rails.[36]

On August 21, 2013, the MTA announced that the 7 Subway Extension was 90% complete.[37] On December 20, 2013, Mayor Michael Bloomberg took a ceremonial ride on a train to the new terminal, celebrating a part of his legacy as Mayor; at the time, the proposed opening date was June 2014.[38][39]

Delays

Soon after Bloomberg's ceremonial ride, the opening date of the subway extension was postponed from June to early fall 2014,[40] then to November 2014,[41] then to February 2015,[42] and then to May 2015.[43] Most of the problems were attributed to the incline elevators being installed in the station,[44] and to the ventilation fans along the tunnel.[42]

On October 1, 2014, the MTA told the New York Daily News that the agency had signed a new agreement with the prime contractor, offering up to $4.75 million in incentive payments if the new station was finished and ready to open to the public by February 24, 2015.[45]

Just two and a half months later, though, the MTA stated that it was unable to open the subway extension for service until April to July 2015, due to the failure to get the inclined elevators to work properly.[43][46] Problems with the security and fire alarm systems were also blamed for the delays.[47] A December 2014 New York Post article attributed the delay to the Hudson Yards rail yard development's developer, The Related Companies', need to dig caissons for the foundations, just above the subway station, and the foundation work needed to be complete before the MTA could open the station.[48] Continuing trouble with the fire and security alarms in March 2015 would delay the opening until summer.[49][50]

The use of inclined elevators was intended to provide wheelchair-using patrons with a shorter, easier path to the train platform, as well as to reduce tunneling costs.[40] The two elevators were manufactured by Maspero Elevatori, in Appiano Gentile, Italy, using a controller made on Long Island, speed governors made in Ohio, and buttons and other parts in Queens.[40] The software for the elevator was written in the United States. Maspero Elevatori assembled the elevators in Italy, and they failed an operational test there, prior to being shipped to the United States.[40] The MTA said the manufacturer chose to use American subcontractors in place of local Italian suppliers after reading the specifications the transit agency submitted. The MTA had been working with the manufacturer to try to resolve the problems caused by a very high level of customization.[40]

On June 1, 2015, a representative for the MTA described the extension as "99% complete". That day, test runs of 7 trains started running to 34th Street–Hudson Yards in preparation for the summer 2015 opening of the extension.[51] However, on June 15, the extension was postponed again to "before the end of the third quarter".[52] On July 20, 2015, it was reported that the MTA planned to open the extension to the public on September 13, 2015.[53][54] The opening date was confirmed on August 28, 2015.[55][56] The station was opened at a ribbon-cutting ceremony on September 13 at about 1 p.m.[57][58][59][60]

Gallery

Discover more about Construction progress related topics

Metropolitan Transportation Authority

Metropolitan Transportation Authority

The Metropolitan Transportation Authority (MTA) is a public benefit corporation responsible for public transportation in the New York City metropolitan area of the U.S. state of New York. The MTA is the largest public transit authority in the United States, serving 12 counties in Downstate New York, along with two counties in southwestern Connecticut under contract to the Connecticut Department of Transportation, carrying over 11 million passengers on an average weekday systemwide, and over 850,000 vehicles on its seven toll bridges and two tunnels per weekday.

Platform screen doors

Platform screen doors

Platform screen doors (PSDs), also known as platform edge doors (PEDs), are used at some train, rapid transit and people mover stations to separate the platform from train tracks, as well as on some bus rapid transit, tram and light rail systems. Primarily used for passenger safety, they are a relatively new addition to many metro systems around the world, some having been retrofitted to established systems. They are widely used in newer Asian and European metro systems, and Latin American bus rapid transit systems.

IRT Broadway–Seventh Avenue Line

IRT Broadway–Seventh Avenue Line

The IRT Broadway–Seventh Avenue Line is a New York City Subway line. It is one of several lines that serves the A Division, stretching from South Ferry in Lower Manhattan north to Van Cortlandt Park–242nd Street in Riverdale, Bronx. The Brooklyn Branch, known as the Wall and William Streets Branch during construction, from the main line at Chambers Street southeast through the Clark Street Tunnel to Borough Hall in Downtown Brooklyn, is also part of the Broadway–Seventh Avenue Line. The IRT Broadway–Seventh Avenue Line is the only line to have elevated stations in Manhattan, with two short stretches of elevated track at 125th Street and between Dyckman and 225th Streets.

Second Avenue Subway

Second Avenue Subway

The Second Avenue Subway is a New York City Subway line that runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, with three new stations on Manhattan's Upper East Side, opened on January 1, 2017. The full Second Avenue Line, if and when it will be funded, will be built in three more phases to eventually connect Harlem–125th Street in Harlem to Hanover Square in Lower Manhattan. The proposed full line would be 8.5 miles (13.7 km) and 16 stations long, serve a projected 560,000 daily riders, and cost more than $17 billion.

IND Eighth Avenue Line

IND Eighth Avenue Line

The IND Eighth Avenue Line is a rapid transit line in New York City, United States, and is part of the B Division of the New York City Subway. Opened in 1932, it was the first line of the Independent Subway System (IND), and the Eighth Avenue Subway name was also applied by New Yorkers to the entire IND system.

Port Authority Bus Terminal

Port Authority Bus Terminal

The Port Authority Bus Terminal is a bus terminal located in Manhattan in New York City. It is the busiest bus terminal in the world by volume of traffic, serving about 8,000 buses and 225,000 people on an average weekday and more than 65 million people a year.

Michael Bloomberg

Michael Bloomberg

Michael Rubens Bloomberg is an American businessman, politician, philanthropist, and author. He is the majority owner, co-founder and CEO of Bloomberg L.P. He was Mayor of New York City from 2002 to 2013, and was a candidate for the 2020 Democratic nomination for President of the United States. He has served as chair of the Defense Innovation Board, an independent advisory board that provides recommendations on artificial intelligence, software, data and digital modernization to the United States Department of Defense, since June 2022.

New York Daily News

New York Daily News

The New York Daily News, officially titled the Daily News, is an American newspaper based in Jersey City, New Jersey. It was founded in 1919 by Joseph Medill Patterson as the Illustrated Daily News. It was the first U.S. daily printed in tabloid format. It reached its peak circulation in 1947, at 2.4 million copies a day. As of 2019, it was the eleventh-highest circulated newspaper in the United States. Today's Daily News is not connected to the earlier New York Daily News, which shut down in 1906.

New York Post

New York Post

The New York Post is a conservative daily tabloid newspaper published in New York City. The Post also operates NYPost.com, the celebrity gossip site PageSix.com, and the entertainment site Decider.com.

Hudson Yards (development)

Hudson Yards (development)

Hudson Yards is a 28-acre (11 ha) real estate development in the area of the same name in Manhattan, New York City, between the Chelsea and Hell's Kitchen neighborhoods. It is located on the waterfront of the Hudson River. Upon completion, 13 of the 16 planned structures on the West Side of Midtown South would sit on a platform built over the West Side Yard, a storage yard for Long Island Rail Road trains. The first of its two phases, opened in 2019, comprises a public green space and eight structures that contain residences, a hotel, office buildings, a mall, and a cultural facility. The second phase, on which construction had not started as of 2022, will include residential space, an office building, and a school.

Caisson (engineering)

Caisson (engineering)

In geotechnical engineering, a caisson is a watertight retaining structure used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, or for the repair of ships. Caissons are constructed in such a way that the water can be pumped out, keeping the work environment dry. When piers are being built using an open caisson, and it is not practical to reach suitable soil, friction pilings may be driven to form a suitable sub-foundation. These piles are connected by a foundation pad upon which the column pier is erected. Caisson engineering has been used at least since the 18th century, and was notably used in the construction of the Brooklyn Bridge, which was completed in 1883.

Appiano Gentile

Appiano Gentile

Appiano Gentile is a comune (municipality) in the Province of Como in the Italian region Lombardy, located about 35 kilometres (22 mi) northwest of Milan and about 12 kilometres (7 mi) southwest of Como.

Construction areas

34th Street–Hudson Yards station

Progress on constructing the 34th Street–Hudson Yards station mezzanine as of June 2011
Progress on constructing the 34th Street–Hudson Yards station mezzanine as of June 2011
The 34th Street station on December 21, 2013
The 34th Street station on December 21, 2013

The 34th Street–Hudson Yards station is under the intersection of 11th Avenue and 34th Street. It is the only station on the extension, and it opened on September 13, 2015.[57][58][59] The MTA says that the new station will "make it possible for new housing, restaurants and entertainment to grow" in the surrounding neighborhoods, including Hell's Kitchen and Chelsea.[61] The station is also close to the Jacob K. Javits Convention Center.[62]

Passenger access to the station includes a pair of incline elevators.[44] The project has been plagued by delays because of the mishaps involved in the installation of the custom-made elevators.[63] In June 2012, the extension's opening was delayed to June 2014, with the rest of the 34th Street–Hudson Yards station to open at the end of 2015;[64][65] As of December 15, 2014, the opening date was changed to mid-2015.[43][46] In April 2014, the first of the 170-foot-long (52 m) incline elevators was installed in the station.[44] The 80-foot (24 m) high incline elevators[25][66] are the first of their kind in the system.[44] The station is the third station in the New York City Subway to have low vibration tracks installed. These tracks provide a smoother, quieter ride for passengers, and eliminate the need for wooden track blocks.[25]

Above-ground structures

The extension contains five street-level structures:[67]

  • Site A, a ventilation building at 11th Avenue between 25th and 26th Streets[67]
  • Site J, a ventilation building at 11th Avenue between 33rd and 34th Streets next to the main entrance and elevator entrance[67]
  • Site K, a ventilation building at 11th Avenue between 35th and 37th Streets[67]
  • Site L, a ventilation building at 41st Street and Dyer Avenue[67]
  • Site P, the secondary station entrance between 11th Avenue between 34th and 35th Streets[67]

Discover more about Construction areas related topics

34th Street–Hudson Yards station

34th Street–Hudson Yards station

The 34th Street–Hudson Yards station is a New York City Subway station in Manhattan's West Side on the IRT Flushing Line, and is the western terminus for the 7 local and <7> express services. It has two tracks and one island platform, with two levels of mezzanines: one directly above the platform and the other directly below street level. The station directly serves the Hudson Yards mega-development above it, and is located within the greater Hudson Yards neighborhood. The station contains two entrances along Hudson Boulevard: a primary entrance south of 34th Street, and a secondary entrance south of 35th Street.

34th Street (Manhattan)

34th Street (Manhattan)

34th Street is a major crosstown street in the New York City borough of Manhattan. It runs the width of Manhattan Island from West Side Highway on the West Side to the FDR Drive on the East Side. 34th Street is used as a crosstown artery between New Jersey to the west and Queens to the east, connecting the Lincoln Tunnel to New Jersey with the Queens–Midtown Tunnel to Long Island.

Hell's Kitchen, Manhattan

Hell's Kitchen, Manhattan

Hell's Kitchen, also known as Clinton, is a neighborhood on the West Side of Midtown Manhattan in New York City. It is considered to be bordered by 34th Street to the south, 59th Street to the north, Eighth Avenue to the east, and the Hudson River to the west.

Chelsea, Manhattan

Chelsea, Manhattan

Chelsea is a neighborhood on the West Side of the borough of Manhattan in New York City. The area's boundaries are roughly 14th Street to the south, the Hudson River and West Street to the west, and Sixth Avenue to the east, with its northern boundary variously described as near the upper 20s or 34th Street, the next major crosstown street to the north. To the northwest of Chelsea is the neighborhood of Hell's Kitchen, as well as Hudson Yards; to the northeast are the Garment District and the remainder of Midtown South; to the east are NoMad and the Flatiron District; to the southwest is the Meatpacking District; and to the south and southeast are the West Village and the remainder of Greenwich Village. Chelsea is named after the Royal Hospital Chelsea in London, England.

Dyer Avenue

Dyer Avenue

Dyer Avenue is a short, north-south thoroughfare in the Hell's Kitchen neighborhood of Manhattan in New York City, located between Ninth Avenue and Tenth Avenue. It is primarily used by traffic exiting the Lincoln Tunnel. Dyer Avenue runs between 30th Street and 42nd Street but functions as three distinct sections due to its connections with the south and center tubes of the Lincoln Tunnel. The southernmost section, between 30th and 31st Streets, leads to and from the Lincoln Tunnel Expressway. Dyer Avenue also exists between 34th and 36th Streets, and between 40th and 42nd Streets; both sections lead directly from the tunnel, but the 34th-36th Streets section also contains a roadway leading to the tunnel. The avenue is owned by the Port Authority of New York and New Jersey.

Proposals

The diamond crossover north of 34th Street
The diamond crossover north of 34th Street

10th Avenue station

Although a new station at 10th Avenue and 41st Street was part of the original plan, the intermediate station was eliminated in October 2007 due to cost overruns, leaving the terminal station at Eleventh Avenue and 34th Street as the only new station on the extension. The MTA indicated that the 10th Avenue station could be included in the project if funding were found.[14] The station was not included in the original (2007) contract award, but was listed as a $450 million option. In late December 2007, reports indicated that the postponed station might be partially built if the City of New York and the MTA agreed on the additional financing for the station shell.[68] In February 2009, the MTA announced that it would build the station if the agency received sufficient funds from the federal economic stimulus package.[69] In June 2010, the city announced it was seeking funding to assess the feasibility of constructing the station at a later date using a two-platform, two-entrance model without an underground connecting passage.[70][71][72][73][74]

Extensions to New Jersey

In 2010, The New York Times reported that Mayor Michael Bloomberg's administration had been considering an extension to Hoboken and to Secaucus Junction in New Jersey, where it would connect with most New Jersey Transit commuter lines. It would offer New Jersey commuters a direct route to Grand Central Terminal on the East Side of Manhattan and connections to most other New York City subway routes.[75] If opened, the extension would take the New York City Subway outside both the city's and the state's borders for the first time. The plan would replace the Access to the Region's Core (ARC) tunnel, which was canceled by New Jersey Governor Chris Christie in October 2010.[76]

A subway extension to New Jersey would cost less than the canceled ARC tunnel, as it would start at 34th Street–Hudson Yards and go west, avoiding the expensive tunnel boring work east to Herald Square and the complex station deep underground there. However, travel times into Manhattan might be longer than under the original ARC proposal, because riders would need to transfer to the subway from New Jersey Transit trains at Secaucus. Additionally, because NJT trains would continue to or from Penn Station, the key goal of reduced tunnel congestion between New Jersey and New York would not be achieved. On the other hand, New Jersey Governor Christie said, "It would actually connect us to the east side of Manhattan, like we always wanted to..."[77] Bloomberg had yet to meet with New York Governor-elect Andrew Cuomo and the project, which could require five additional years to develop, would not be automatically entitled to the federal funding allotted to the ARC tunnel.[78][79][80][81] Christie and the Port Authority supported the plan, agreeing to split the estimated US$10 billion cost if it is officially approved.[82] On February 2, 2011, the city's Economic Development Corporation voted to budget up to $250,000 for a feasibility study into the proposed New Jersey extension, which was carried out by engineering firm Parsons Brinckerhoff.[83][84]

Amtrak's February 2011 announcement of the Gateway Project includes a proposal to extend the 7 service three blocks east of Eleventh Avenue to New York Penn Station, instead of five miles west to Secaucus.[85] Gateway, under auspices of Amtrak, would include a high-speed rail right-of way from Newark Penn to New York Penn and provide more capacity on New Jersey Transit rail operations. Congress allocated $15 million for studies for the project in November 2011, with the likelihood that the two projects, Gateway and the subway extension, will be in competition for funding.[86]

In April 2012, citing budget considerations, the director of the MTA, Joe Lhota, said that it was doubtful the extension would be built in the foreseeable future, suggesting that the Gateway Project was a much more likely solution to congestion at Hudson River crossings.[87] However, the Parsons Brinckerhoff feasibility study, which was released in April 2013,[88][89] revived hope for the project, with Mayor Bloomberg saying, "Extending the 7 train to Secaucus is a promising potential solution ... and is deserving of serious consideration."[88][90] The study investigated the possible effects of the construction of the infill station at 10th Avenue, tunnels running along the path of the ARC tunnel, and a multi-level multi-modal addition to Secaucus Junction. A widening of the right-of way of the Northeast Corridor was considered.[91]

In a November 2013 Daily News opinion article, the president of the Real Estate Board of New York and the chairman of Edison Properties called for the line to be extended to Secaucus in tunnels to be shared with the Gateway Project.[92] Later in November 2013 the New Jersey Assembly passed a Resolution 168[93] supporting the extension of the line to Hoboken and Secaucus.[94]

In 2017, a further extension of the 7 train to New Jersey was suggested once again, this time as an alternative to constructing a replacement for the Port Authority Bus Terminal.[95] An alternative would include a new terminal at Secaucus Junction in connection with the 7 extension.[96] In February 2018, it was revealed that the Port Authority of New York and New Jersey had advertised for consultants to write a feasibility study for such an extension, and that it had received bids from several companies. This extension was being planned along with the Gateway Project and, if built, would be able to accommodate a projected 38% increase in the number of people commuting between the two states. The 18-month study would include input from the Port Authority, the MTA, and NJ Transit.[97][98] If the New Jersey subway extension were to be constructed, it could complement the Gateway Project, which might become overcrowded by 2040.[98][99] At the time, the Port Authority was upgrading the PATH subway system, the only rapid transit link between New York and New Jersey, so that PATH routes could accommodate higher frequencies of trains (and consequently, more passengers).[98]

Extension to 14th Street

The Regional Plan Association, in its Fourth Plan in 2017, proposed extending the 7 subway down the tail tracks and the Hudson waterfront to a new station at 14th Street and Tenth Avenue, with an intermediate stop at 23rd Street and Eleventh Avenue. If constructed, the new Tenth Avenue station would feature a pedestrian connection to the 14th Street/Eighth Avenue station, with transfers to the A, ​C, ​E​, and L trains, and the tunnel would be configured to allow for a New Jersey extension.[100]

Discover more about Proposals related topics

American Recovery and Reinvestment Act of 2009

American Recovery and Reinvestment Act of 2009

The American Recovery and Reinvestment Act of 2009 (ARRA), nicknamed the Recovery Act, was a stimulus package enacted by the 111th U.S. Congress and signed into law by President Barack Obama in February 2009. Developed in response to the Great Recession, the primary objective of this federal statute was to save existing jobs and create new ones as soon as possible. Other objectives were to provide temporary relief programs for those most affected by the recession and invest in infrastructure, education, health, and renewable energy.

Michael Bloomberg

Michael Bloomberg

Michael Rubens Bloomberg is an American businessman, politician, philanthropist, and author. He is the majority owner, co-founder and CEO of Bloomberg L.P. He was Mayor of New York City from 2002 to 2013, and was a candidate for the 2020 Democratic nomination for President of the United States. He has served as chair of the Defense Innovation Board, an independent advisory board that provides recommendations on artificial intelligence, software, data and digital modernization to the United States Department of Defense, since June 2022.

Hoboken, New Jersey

Hoboken, New Jersey

Hoboken is a city in Hudson County in the U.S. state of New Jersey. Hoboken is part of the New York metropolitan area and is the site of Hoboken Terminal, a major transportation hub for the tri-state region. As of the 2020 United States census, the city's population was 60,419, an increase of 10,414 (+20.8%) from the 2010 census count of 50,005, which in turn reflected an increase of 11,428 (+29.6%) from the 38,577 counted in the 2000 census. The Census Bureau's Population Estimates Program calculated that the city's population was 58,690 in 2021, ranking the city as the 668th-most-populous in the country. With more than 42,400 inhabitants per square mile (16,400/km2) in data from the 2010 census, Hoboken was ranked as the third-most densely populated municipality in the United States among cities with a population above 50,000. In the 2020 census, the city's population density climbed to more than 48,300 inhabitants per square mile (18,600/km2) of land, ranked fourth in the county behind Guttenberg, Union City and West New York.

New Jersey

New Jersey

New Jersey is a state situated within both the Mid-Atlantic and Northeastern regions of the United States. It is the most densely populated U.S. state, and is situated at the center of the Northeast megalopolis, the most populous American urban agglomeration. New Jersey is bordered on its north and east by the state of New York; on its east, southeast, and south by the Atlantic Ocean; on its west by the Delaware River and Pennsylvania; and on its southwest by Delaware Bay and the state of Delaware. At 7,354 square miles (19,050 km2), New Jersey is the fifth-smallest state in land area, but with close to 9.3 million residents as of the 2020 United States census, its highest decennial count ever, ranks 11th in population. The state capital is Trenton, and the most populous city is Newark. New Jersey is the only U.S. state in which every county is deemed urban by the U.S. Census Bureau, with 13 counties included in the New York metropolitan area, seven counties in the Philadelphia metropolitan area, and with Warren County constituting part of the rapidly industrializing Lehigh Valley metropolitan area.

Grand Central Terminal

Grand Central Terminal

Grand Central Terminal is a commuter rail terminal located at 42nd Street and Park Avenue in Midtown Manhattan, New York City. Grand Central is the southern terminus of the Metro-North Railroad's Harlem, Hudson and New Haven Lines, serving the northern parts of the New York metropolitan area. It also contains a connection to the Long Island Rail Road through the Grand Central Madison station, a 16-acre (65,000 m2) rail terminal underneath the Metro-North station, built from 2007 to 2023. The terminal also connects to the New York City Subway at Grand Central–42nd Street station. The terminal is the third-busiest train station in North America, after New York Penn Station and Toronto Union Station.

Access to the Region's Core

Access to the Region's Core

Access to the Region's Core (ARC) was a proposed commuter-rail project to increase passenger service capacity on New Jersey Transit (NJT) between Secaucus Junction in New Jersey and Manhattan in New York City. New infrastructure would have included new trackage, a new rail yard, and a tunnel under the Hudson River. A new station adjacent to New York Penn Station was to be constructed as running more trains into the current station was deemed unfeasible. An estimated budget for the project was $8.7 billion. Construction began in mid-2009 and the project was slated for completion in 2018, but it was cancelled in October 2010 by Chris Christie, the governor of New Jersey, who cited the possibility of cost overruns and the state's lack of funds. Six hundred million dollars had been spent on the project. The decision remains controversial.

Governor of New Jersey

Governor of New Jersey

The governor of New Jersey is the head of government of New Jersey. The office of governor is an elected position with a four-year term. There is a two consecutive term term limit, with no limitation on non-consecutive terms. The official residence of the governor is Drumthwacket, a mansion located in Princeton, New Jersey. The governor’s office is located inside of the New Jersey State House in Trenton, making New Jersey notable as the executive’s office is located in the same building as the legislature. New Jersey is also notable for being one of the few states in which the governor’s official residence is not located in the state capital.

Chris Christie

Chris Christie

Christopher James Christie is an American politician, lawyer, political commentator, lobbyist, and former federal prosecutor who served as the 55th governor of New Jersey from 2010 to 2018.

Herald Square

Herald Square

Herald Square is a major commercial intersection in the Midtown Manhattan neighborhood of New York City, formed by the intersection of Broadway, Sixth Avenue, and 34th Street. Named for the now-defunct New York Herald, a newspaper formerly headquartered there, it also gives its name to the surrounding area. The bow tie-shaped intersection consists of two named sections: Herald Square to the north (uptown) and Greeley Square to the south (downtown).

Governor of New York

Governor of New York

The governor of New York is the head of government of the U.S. state of New York. The governor is the head of the executive branch of New York's state government and the commander-in-chief of the state's military forces. The governor has a duty to enforce state laws and the power to either approve or veto bills passed by the New York Legislature, to convene the legislature and grant pardons, except in cases of impeachment and treason. The governor is the highest paid governor in the country.

Andrew Cuomo

Andrew Cuomo

Andrew Mark Cuomo is an American lawyer and politician who served as the 56th governor of New York from 2011 to 2021. A member of the Democratic Party, he was elected to the same position that his father, Mario Cuomo, held for three terms. In 2021, Cuomo resigned from office amidst numerous allegations of sexual misconduct and covering up COVID-19 deaths in nursing homes. At the time of his resignation, he was the longest-serving governor in the United States still in position.

Feasibility study

Feasibility study

A feasibility study is an assessment of the practicality of a project or system. A feasibility study aims to objectively and rationally uncover the strengths and weaknesses of an existing business or proposed venture, opportunities and threats present in the natural environment, the resources required to carry through, and ultimately the prospects for success. In its simplest terms, the two criteria to judge feasibility are cost required and value to be attained.

Awards and innovations

The New York State Society of Professional Engineers awarded the first construction phase, "Running Tunnels and Underground Structures," its 2013 Construction Project of the Year. According to the society, the project team won the award "for outstanding professional engineering efforts in developing creative solutions and innovative technologies in construction of an infrastructure project. The No. 7 project used the first double-shielded tunnel boring machines (TBMs) to tunnel under New York City while placing precast concrete segments to form the tunnels' walls. For the first time in the world, a ground freezing method was used to harden soil to act as rock to allow TBMs to maintain proper course while boring and placing the tunnel liners."[101] While the extension extends 1 mile (1.6 km), the tunnels are actually 1.5 miles (2.4 km) long.[102]

Source: "7 Subway Extension", Wikipedia, Wikimedia Foundation, (2023, March 19th), https://en.wikipedia.org/wiki/7_Subway_Extension.

Enjoying Wikiz?

Enjoying Wikiz?

Get our FREE extension now!

See also


References
  1. ^ Stern, Michael (December 8, 1970). "6TH AND LAST PART OF MASTER PLAN ON CITY RELEASED; Volume on Manhattan Urges Building of Offices Along 48th St. Transit Line WESTWARD PATTERN SET Condemnation of Big Tracts Intended to Insure Public Use of Some of Area". The New York Times. Retrieved September 20, 2015.
  2. ^ Witkin, Richard (November 4, 1971). "State Will Cancel Some Road Projects". The New York Times.
  3. ^ Department of City Planning, "Shaping the City's Future," 1993.
  4. ^ a b c Moss, Mitchell L. (November 2011). "HOW NEW YORK CITY WON THE OLYMPICS" (PDF). Rudin Center for Transportation Policy and Management, Robert F. Wagner Graduate School of Public Service. New York University. Retrieved September 11, 2015.
  5. ^ a b Preparing for the Future: A Commercial Development Strategy for New York City : Final Report. Group of 35. 2001. p. 56. Retrieved September 12, 2015.
  6. ^ "No. 7 Subway Extension". Hudson Yards Development Corporation. Archived from the original on February 9, 2015. Retrieved July 3, 2013.
  7. ^ a b Dobnik, Verena (February 7, 2013). "NYC Transit Projects: East Side Access, Second Avenue Subway, and 7 Train Extension". Huffington Post. Retrieved July 24, 2013.
  8. ^ Bagli, Charles V.; Cooper, Michael (June 7, 2005). "Olympic Bid Hurt as New York Fails in West Side Stadium Quest". The New York Times. Retrieved September 12, 2015.
  9. ^ Bernstein, Andrea (July 6, 2005). "New York Comes in a Disappointing Fourth Place". WNYC. Retrieved September 12, 2015.
  10. ^ "NO. 7 SUBWAY EXTENSION-HUDSON YARDS REZONING AND DEVELOPMENT PROGRAM" (PDF). nyc.gov. Archived from the original (PDF) on March 4, 2016. Retrieved September 26, 2015.
  11. ^ Purnick, Joyce (January 2, 2005). "What Rises in the West? Uncertainty". The New York Times. Retrieved March 6, 2010.
  12. ^ Hinderer, Katie (December 13, 2006). "NYC Mayor Outlines Long-Term Growth Plan". GlobeSt.com. Archived from the original on May 13, 2009. Retrieved February 28, 2010.
  13. ^ "City Raises $2 Billion In Bonds For No. 7 Line Extension". NY1. December 7, 2006. Archived from the original on October 11, 2007. Retrieved February 28, 2010.
  14. ^ a b c "Transit Board Approves Funding For 7 Line Extension". NY1. October 25, 2007. Archived from the original on March 25, 2008. Retrieved February 28, 2010.
  15. ^ "Top New York Projects" (PDF). New York Construction. June 2008. p. 27. Archived from the original (PDF) on July 8, 2011. Retrieved February 28, 2010.
  16. ^ "Mayor Bloomberg and Governor Spitzer Announce Start of Construction on #7 Subway Extension" (Press release). New York City Mayor's Office. December 3, 2007. Retrieved February 28, 2010.
  17. ^ a b "No. 7 Subway Line Extension". Dattner Architects. Archived from the original on March 15, 2012. Retrieved February 28, 2010.
  18. ^ "MTA Plans To Install Platform Doors On 7 Line Extension". NY1. September 8, 2007. Archived from the original on March 25, 2008. Retrieved February 28, 2010.
  19. ^ Donohue, Pete (August 4, 2006). "Cooler Subways Coming – Eventually". Daily News. New York. Archived from the original on December 27, 2016. Retrieved February 28, 2010.
  20. ^ Roberts, Sam (September 30, 2013). "No Heel Hazards (or Gusts) as Subway Expands". New York Times. New York. Retrieved May 5, 2014.
  21. ^ Neuman, William (October 20, 2007). "Higher Costs Force Cutback in Extension of the No. 7 Line". The New York Times. Retrieved September 28, 2015.
  22. ^ Olshan, Jeremy (October 21, 2007). "MTA: IT'S WESTWARD HO(LD ON A $EC) FOR NO. 7 TRAIN". Internet Archive. Archived from the original on October 21, 2007.
  23. ^ "MTA starts work on No. 7 train extension". AM New York. December 14, 2007. Archived from the original on December 14, 2007.
  24. ^ Mindlin, Alex (April 20, 2008). "No Whoosh, No 'All Aboard'". The New York Times. Retrieved February 28, 2010.
  25. ^ a b c "mta.info | Capital Programs 7 Line Extension". web.mta.info. Retrieved August 30, 2016.
  26. ^ "Easy-to-Install CertainTeed Certa-Lok Yelomine Offers Ideal Solution for Temporary Water Lines for Metropolitan Transportation Authority's No. 7 Subway Extension" (Press release). CertainTeed. January 25, 2011.
  27. ^ "Metropolitan Transportation Authority And Mayor Bloomberg Preside Over Lowering Of Tunnel Boring Machine For 7 Line Subway Extension" (Press release). Metropolitan Transportation Authority. February 19, 2009. Archived from the original on December 18, 2010. Retrieved February 28, 2010.
  28. ^ "Construction Update — November 2008". Metropolitan Transportation Authority. Archived from the original on October 5, 2009. Retrieved August 27, 2009.
  29. ^ a b "Mayor Bloomberg And Mta Announce Completion Of First Phase Of Number 7 Subway Extension". NYC.gov. December 21, 2009. Archived from the original on June 20, 2015. Retrieved June 9, 2014.
  30. ^ "West Side Development Project Gets The Green Light". NY1. December 21, 2009. Archived from the original on April 7, 2012. Retrieved February 28, 2010.
  31. ^ Cuza, Bobby (February 19, 2009). "Crews Lower Giant Drill Into 7 Line Tunnel". NY1. Archived from the original on May 5, 2009. Retrieved February 28, 2010.
  32. ^ a b "New Milestone for No. 7 Subway Extension Project". Metropolitan Transportation Authority. June 11, 2010. Archived from the original on June 13, 2010. Retrieved June 12, 2010.
  33. ^ a b "New Milestone for No. 7 Subway Extension Project". Metropolitan Transportation Authority. July 15, 2010. Archived from the original on July 24, 2010. Retrieved July 16, 2010.
  34. ^ "7 Train Extension Celebrates Major Breakthrough". NY1. July 15, 2010. Archived from the original on September 29, 2012. Retrieved July 16, 2010.
  35. ^ "Work on Extending the No. 7 Line Continues to Progress". MTA. April 4, 2011. Archived from the original on August 20, 2011. Retrieved April 4, 2011.
  36. ^ Miller, Luther S. (May 10, 2012). "NYCT's No. 7 extension gets first rails". Railway Age.
  37. ^ "7 Line Extension 90 Percent Complete". MTA Press Release. Retrieved August 22, 2013.
  38. ^ "Three cheers for the No. 7 extension". New York Post. December 20, 2013.
  39. ^ Fermino, Jennifer (October 21, 2013). "Mayor Bloomberg gets ride on No. 7 subway line extension he championed". NY Daily News. New York. Archived from the original on December 22, 2013. Retrieved December 22, 2013.
  40. ^ a b c d e Flegenheimer, Matt (January 27, 2014). "More Delays and Rising Cost for Project Connecting L.I.R.R. to Grand Central Terminal". New York Times.
  41. ^ Lynch, Marley (February 26, 2014). "Subway update: 7-train extension to now open in November". Time Out New York. Retrieved September 13, 2015.
  42. ^ a b Mueller, Benjamin (June 23, 2014). "Transit Hub and Work on No. 7 Line Face Delays". New York Times.
  43. ^ a b c Donohue, Pete (December 15, 2014). "New York will have to wait till spring for No. 7 subway extension". NY Daily News. Retrieved December 15, 2014.
  44. ^ a b c d Donohue, Pete (April 28, 2014). "Metropolitan Transportation Authority building New York City subway system's first inclined elevator". New York Daily News. Retrieved April 29, 2014.
  45. ^ Donohue, Pete (October 1, 2014). "No. 7 subway line extension to West Side on track to open in February: official". New York Daily News. Archived from the original on October 1, 2014.
  46. ^ a b Sill, Andrew (December 15, 2014). "Hudson Yards subway extension delayed again". NBC New York.
  47. ^ Goldberg, Barbara (December 21, 2014). "NYC subway extension may transform Manhattan neighborhood". McCall.com.
  48. ^ Harshbarger, Rebecca (December 15, 2014). "7 train opening delayed". New York Post.
  49. ^ "7 subway line extension delayed yet again, eyes summer opening". New York Business Journal. March 24, 2015.
  50. ^ Fitzsimmons, Emma G. (March 24, 2015). "More Delays for No. 7 Subway Line Extension". The New York Times. Retrieved March 29, 2015.
  51. ^ "MTA Begins Training Employees On No. 7 Line Extension". CBS News. June 1, 2015. Retrieved June 1, 2015.
  52. ^ Martinez, Jose (June 15, 2015). "MTA: 7 Line Extension to Open Up Before End of Third Quarter". NY1. Retrieved June 20, 2015.
  53. ^ Whitford, Emma (July 20, 2015). "7 Line Extension Will Open "By September 13th"". Gothamist. Archived from the original on July 22, 2015.
  54. ^ Siff, Andrew (July 2015). "Hudson Yards Subway Extension to Open in September: MTA". NBC New York.
  55. ^ Tangel, Andrew (August 28, 2015). "At Last: New Station for 7 Train Set to Open". WSJ. Retrieved September 10, 2015.
  56. ^ Newman, Philip (September 10, 2015). "No. 7 station to open at last on 11th Ave. in Manhattan". TimesLedger. Retrieved September 10, 2015.
  57. ^ a b Fitzsimmons, Emma G. (September 10, 2015). "Subway Station for 7 Line Opens on Far West Side". The New York Times. Retrieved September 13, 2015.
  58. ^ a b "New 7 line subway extension to the West Side opens". ABC7 New York. September 13, 2015. Retrieved September 13, 2015.
  59. ^ a b Tangel, Andrew (September 13, 2015). "New Subway Station Opens on NYC's Far West Side". WSJ. Retrieved September 13, 2015.
  60. ^ "New 34 St-Hudson Yards 7 Station Opens". Building for the Future. New York, New York: Metropolitan Transit Authority. Archived from the original on March 4, 2016. Retrieved March 10, 2016. The new station opened September 13, 2015
  61. ^ Staff writer(s). "7 Line Extension". Metropolitan Transportation Authority. Retrieved July 3, 2013.
  62. ^ Green, Dennis (April 29, 2015). "A series of delays have kept a now fully completed subway station under Manhattan from opening". Business Insider. Retrieved September 13, 2015. The troubled extension ... will eventually extend the 7 train one station west to serve a new development over the West Side Yard train tracks (known as Hudson Yards) and finally provide a rail link to the Jacob Javits Convention Center.
  63. ^ Flegenheimer, Matt (May 29, 2014). "With New Slant on Subway Elevators, Expect Delays". The New York Times. Retrieved May 29, 2014.
  64. ^ "MTA's 7 Line Extension Project Pushed Back Six Months". NY1. June 5, 2012. Archived from the original on July 11, 2012. Retrieved June 5, 2012.
  65. ^ Cuozzo, Steve (June 5, 2012). "No. 7 train 6 mos. late". New York Post. Retrieved June 5, 2012.
  66. ^ Flegenheimer, Matt (December 20, 2013). "For a Mayor on His Way Out, a Subway Station on Its Way In". The New York Times. Retrieved December 24, 2013.
  67. ^ a b c d e f "Capital Program 7 Line Extension". MTA.info. December 20, 2013. Retrieved January 30, 2014.
  68. ^ Naanes, Marlene (December 20, 2007). "7 Line Extension May Get 41st Street Stop". amNewYork. Archived from the original on May 13, 2009. Retrieved February 28, 2010.
  69. ^ Kabak, Benjamin (February 2, 2009). "Will the Stimulus Save 7 Extension Stop?". Second Ave. Sagas. Retrieved February 28, 2010.
  70. ^ Agovino, Theresa (February 16, 2010). "Outcry Emerges for 41st St. Stop on New 7-Line". Crain's New York Business. Archived from the original on February 18, 2010. Retrieved April 3, 2010.
  71. ^ Urban, Jill (April 2, 2010). "West Side Developers Fight For 7 Line Extension". NY1. Archived from the original on April 17, 2010. Retrieved April 3, 2010.
  72. ^ "City Officials Seek Federal Assistance For 7 Subway Extension". NY1. April 27, 2010. Archived from the original on May 31, 2010. Retrieved April 27, 2010.
  73. ^ "City Considering 10th Avenue Stop For 7 Train". NY1. June 10, 2010. Archived from the original on September 27, 2012. Retrieved June 10, 2010.
  74. ^ "Mayor Applies For Funds To Redesign 7 Train Extension". NY1. June 30, 2010. Archived from the original on July 14, 2011. Retrieved June 30, 2010.
  75. ^ Bagli, Charles V. (November 17, 2010). "Take the No. 7 to Secaucus?". The New York Times. Retrieved July 3, 2013.
  76. ^ Bagli, Charles V. (November 16, 2010). "New York Studies Extending Subway Line to New Jersey". The New York Times. Archived from the original on November 18, 2010. Retrieved November 16, 2010.
  77. ^ Bernstein, Andrea (November 16, 2010). "Mayor Bloomberg Explores Extending Subway to New Jersey". WNYC. Archived from the original on November 20, 2010.
  78. ^ O'Grady, Jim (November 17, 2010). "Bloomberg: New Tunnel Could Be "Even Better" Than ARC". Transportation Nation. WNYC.
  79. ^ "NJ Commuters Like 7 Train Extension Plan". WCBS. November 17, 2010.
  80. ^ "Tunnel to Nowhere Might Become 7 to Secaucus". WNBC. November 17, 2010.
  81. ^ Roth, Jaime (November 17, 2010). "7 Subway Extension to NJ (Video)". WABC. Archived from the original on June 29, 2011. Retrieved November 18, 2010.
  82. ^ Margolin, Josh (October 26, 2011). "Mayor aboard subway to NJ (Supports No. 7 extension to Secaucus)". New York Post. Retrieved October 26, 2011.
  83. ^ Bernstein, Andrea (February 4, 2011). "City finally puts $ behind subway to New Jersey". Transportation Nation. Archived from the original on February 6, 2011. Retrieved February 7, 2011.
  84. ^ New York City Economic Development Commission (February 2, 2011). "No. 7 Line Extension to Secaucus Consultant Services" (PDF). www.scribd.com. Retrieved February 7, 2011.
  85. ^ "Gateway Project" (PDF). Amtrak. February 2011. p. 7. Archived from the original (PDF) on February 7, 2011. Retrieved February 7, 2011.
  86. ^ Higgss, Larry (December 4, 2011). "Tunnelvision Gateway project, No. 7 train extension latest to vie for trans-Hudson blessing". Asbury Park Press. Retrieved December 5, 2011.
  87. ^ Haughney, Christine (April 3, 2012). "MTA Chief rules out subway line to New Jersey". The New York Times. Retrieved April 4, 2012.
  88. ^ a b Frassinelli, Mike (April 10, 2013). "Plan to extend No. 7 subway from NYC to New Jersey could be back on track". The Star-Ledger. Retrieved April 10, 2013.
  89. ^ Rouse, Karen (April 10, 2013). "Report: Extending NY No. 7 subway line to Secaucus would accommodate commuter demand". The Record. Archived from the original on April 13, 2013. Retrieved April 10, 2013.
  90. ^ Parsons Brinckerhoff (April 2013). No 7 Secaucus Extension Feasibility Analysis Final Report (PDF) (Report). NYCEDC. p. III–X. Archived from the original (PDF) on November 5, 2013. Retrieved April 10, 2013.
  91. ^ Parsons Brinckerhoff (April 2013). No 7 Secaucus Extension Feasibility Analysis Final Report (PDF) (Report). NYCEDC. p. 1. Archived from the original (PDF) on November 5, 2013. Retrieved April 10, 2013.
  92. ^ Gottesman, Jerry; Spinola, Steven (November 4, 2013). "Let's extend the 7 train to Secaucus After the far West Side, the next stop on the 7 should be across the river". Daily News. New York. Retrieved November 4, 2013.
  93. ^ "AN ASSEMBLY RESOLUTION supporting the extension of the New York City IRT Flushing Line into the State of New Jersey" (PDF). ASSEMBLY RESOLUTION No. 168 STATE OF NEW JERSEY 215th LEGISLATURE. New Jersey Legislature. May 13, 2013. Retrieved November 26, 2013.
  94. ^ Brenzel, Kathryn (November 26, 2013). "Committee green lights expansion of NYC subway to Hoboken". NJ.com. Retrieved November 26, 2013.
  95. ^ Higgs, Larry (April 21, 2017). "New York subway extension to N.J. may not be dead after all". NJ.com. Retrieved February 28, 2018.
  96. ^ Smith, Sandy (April 26, 2017). "On-Again, Off-Again New Jersey Bus Terminal May Be On Again". Next City. Retrieved May 5, 2017.
  97. ^ Barone, Vincent (February 27, 2018). "Cross-Hudson study options include 7 line extension into NJ". am New York. Retrieved February 28, 2018.
  98. ^ a b c McGeehan, Patrick (February 27, 2018). "A Subway Ride to New Jersey? It Could Happen, Officials Say". The New York Times. ISSN 0362-4331. Retrieved February 28, 2018.
  99. ^ Rivoli, Dan (February 13, 2018). "Transit study will look into running No. 7 train into New Jersey". NY Daily News. Retrieved February 28, 2018.
  100. ^ "Fourth Regional Plan - Regional Plan Association". Regional Plan Association. November 2017. Retrieved January 22, 2022.
  101. ^ "New York State Society of Professional Engineers Recognizes No. 7 Line Project". Tunnel Business Magazine. July 3, 2013. Retrieved August 20, 2013.
  102. ^ "7 Line Extension". MTA.info. Retrieved November 10, 2013.
External links

Route map:

KML is from Wikidata

The content of this page is based on the Wikipedia article written by contributors..
The text is available under the Creative Commons Attribution-ShareAlike Licence & the media files are available under their respective licenses; additional terms may apply.
By using this site, you agree to the Terms of Use & Privacy Policy.
Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization & is not affiliated to WikiZ.com.